NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

OSHA sampling summary, 2/13/02

Machine-extracted title · confidence 42%

OSHA sampling results: asbestos and noise data for debris-field operations as of 2/13/02.

NYC-WTC_000339831–000339834
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OSHA SAMPLING RESULTS SUMMARY AS OF 2/13/02

Asbestos: A total of 1027 samples (excluding bulk and blank samples) for asbestos have been taken. From 9/13 -9/21, 177 samples were taken in the financial district They were taken on OSHA personnel as they walked within certain predetermined zones. Results revealed asbestos concentrations ranging from ND (none detected) to .037 free., well below OSHA’s permissible exposure limit (PEL) ofO.l free. After 9/21, sampling focused on the rubble pile and those workers working on or immediately next to it. 139 of the samples analyzed exceeded OSHA’s limit via PCM analysis. However, upon further analysis using disenminating counting methods and/or TEM analysis, the number of asbestos fibers found dropped dramatically to below delectable levels or well below .l free.

Carbon Monoxide; ■50

Noise: oisy

ional

Total Dust (PNOR) A- total oi und the rubble pile were taken. 5 samples w'ere found to be in excess ofthe PEL for Total dust (15mg/m3). The highest exposure was found on one operator who was exposed at approximately 4X PEL. Respirable Silica; The overwhelming majority of 674 silica samples (excluding bulk and blank samples) show no detectable levels of airborne silica. However, 41 exposures exceeded the PEL. The highest sample result was approximately twenty-one times the OSHA limit (jack hammering concrete 16 feet below grade). The other elevated exposures were approximately one to fourteen times the OSHA limit. These exposures occurred during: 1) pre-drilling /slurry wall 2) jack hammering, 3) rubble removal and loading operations near the Winter Garden: 4) during the breaking up of concrete in the pit; 5) while

Page 1 of 3

CITY_21MC100_007222299 NYC-WTC_000339831

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339831Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →