Memo detailing observations from a visit to WTC; discusses abatement of asbestos-containing wrap around conduit in Path tunnels and access limitations.

NYC-WTC_000339726–000339727
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7 \

City of New York Department of Design and Construction

Memorandum TO: Robert Adams, Program Director, EHSS

FROM: Clifton Oates, Project Director, EHSS

DATE: 03-29-01

SUBJECT: WTC Asbestos Abatement Work

I have prepared a brief overview of my observations made during yesterday’s visit to WTC. I met with Fred Burkhardt of ATC who gave me a summary of events and allowed me to review the existing paperwork (i.e. notifications, air sample results, bulk sample results). I was subsequently escorted through the premises by Fred and Victor Hillman of Liberty Mutual. Please review the following comments;

• Abatement work inside of the Path tunnels located underneath Bldg. No. 6 and the northern perimeter of the slurry wall has been completed. Abatement involved the removal of asbestos­ containing transite wrap located around conduit embedded inside concrete. This conduit rims parallel to the Path rail line. Abatement was conducted relevant to the recovery and debris removal activities. Currently, no more abatement work is slated to take place inside of those tunnels, according to Bovis. This is obviously subject to change. In addition, those Path tunnels cannot be entered into at this time due to the area being designated as structurally unsound.

• Abatement work has essentially been completed just east of the east slurry wall, where the Path escalators were previously present and have been removed. The materials removed were transite panels embedded inside the lining of the escalators. What was previously a muddy mixture of water and transite material inside of the escalator pit has removed. The muddy water has been pumped out and stored and will undergo testing for ACM’s. The sediment has been manually removed and disposed of as ACM waste. Abatement handlers were in the process of removing the collection of remaining bags during my visit.

• The debris pile located at the site of the Path escalators will have to be sorted for ACM’s. This work will have to be coordinated with FDNY recovery efforts to take place on that debris pile. This matter is currently in the process of negotiation.

CITY_21MC100_007220695

NYC-WTC_000339726

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339726Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →