Full-containment abatement project monitor log

Machine-extracted title · confidence 40%

Abatement monitoring log for full-containment project activities.

NYC-WTC_000339300–000339301
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(Satc'

11. Client: A 3 lOBIATCt INC PROJECT MONITOR LOG Part 1

ftW3^^(>>frSgooi iAizg^l S. Ccritractor' 7. Contractor's Foreman; 18. ATC Rep,-csentati</e 9. Date:

lype of Project: Full-Conlalnment Tent-Containj eiovebagging Other

Size of Project Large (> ISOsq. ft., £60 lin, W) Small (< 160 sq.ft., 260iiii.ft,)

Ptiase of Abatement; Pra-abatemantSamp'mg Prep Removal Cleaning

tni lation Waste Load out Finals

FULL-CONTAINMENT ABATEMENT

Work Area lation (floor, room, sectton):

Preparation of Wohe^rea: Yes (Indicate prep wotk pe-fornned in 1 /10) N,'A (If alreacy completed

1. Construction of Decon: Yes No a Ceiling Poly: Yes No 3. Critical Barriers (CBs); Yes No 4 V7all Poly: Yes No 5. Removal to establish CBs; ____ No 6. Floor Poly: Yes____ No 7. Negative air: 1^0 8. Pre ciaanipg: Yes No i 9. Prep work completed: Yes ^^No 10. Tepafwary Power: Yes No ! 11. Other_______ _ Yes ____ Nd- j-eiTrep-inspectlon Passes: Yes No (Explain why)

Removal: Yes (Comploto 1 6J N/A 1. Type of ACM. Pipe Insulation Duct InsulatiolT-. Firsprooling ____ Ceiling Tile Boiler Insulation frarisite Boards Flooi Tile Other:

2. Negative air pressure > 0.02 in. qtwffler; Yes No 3. Amended watehs^ during ramoval: Yes No 4. Critical barriers intact for shifKcuratinn- Yes No fi. Proper Decon procMbt^followed: Yes No

I Cleaning; Yes (Complete I ■ 6! N./A

i 1.1st IS 2nd Stage 3rci Stage 2. 12/12-hour waiting period after 1st nlfia>><n' ' 3. ReiTOvslfiof 1st poly layer after Is, Jeariirig: Yes No 4. 4,T 2-1'1001 waiting period after 2nd cleaning; Y'es ____ No i S^JSrfmcval of 2nd poly layer after 2nc cleaning; Yes No S. 1'12-hour waiting period after 3rd cleaning; Yes No

TENT-CONTAINMENT ABATEMENT ’r

work Area Loc: (floor, room, section):

Preparation of work Area; Yes (Indicate prep work performed in 1 -6) N/A Ilf already completed;

1. Constfiiction of Tent. Yes 2. Pre-cleaning: Yes No 3. Constr.icrlo-i of Decon: Yes No 4. Negative Air; Yes No N,'A 5. Prep work completed: Yes____ No s^Pref-inspercticn passes; Yes No

Renroval: 1. Type Of ACM: Pipe insulation Duct lnjuiat;oYi\ Fireproofing Ceiii'ig Trie Boiler insulation Transite Boards Floor Tile Otnen 2. Meifiod ur Removal; Gross r eiTrcvai within tant Ofty/ebag removal within tent (check 3 through B)

(If Glovebag Renio-val Cfiei:k 3 thrujgli 8} ' 3. Glovebags smoke-tested; Yes No 4. Glovebags atiactied to smooth surface: Yes No I j 5. AmenOed water used; Yes No 6. Rsmoval rnchjde.-l cleaning and encapsulation- Yes No I I 7 Open,'demagrjfJ arrds o' irisui. serded Yes No 6. OlovePags vacuumed, double-bagged: Ye: No I

L Continued on Back Form NY-

CITY_21MC100_003063979

NYC-WTC_000339300

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339300Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →