NYC 9/11 Public Portal Document
MORETRENCH AMERICAN CORPORATION
WWW. mo re trench, com
100 Stickle Avenue
P.O. Box 316
Rockaway, N.J. 07866
August 13, 2002 Tel: (973) 627-2100
Fax: (973) 627-39.50 / 627-6078
VIA FED. EX
Mr. Carl Passed
Port Authority of NY/NJ
115 Broadway - 5'*’ floor
New York, NY 10006
RE: World Trade Center Dewatering
Contract No. 20020004649
MTA Job 01-4906
Water Analyses - Sump
Dear Carl:
Attached find results of the analysis of the water samples taken from the WTC site on August
5, 2002. MTBE level for the sump was 17 ppb. Chlorodifluoromethane was 140 ppb in the
sump.
We are also forwarding a copy of the tables which track MTBE and Chlorodifluoromethane
concentrations for all of the water sample testing which has been performed on the site.
Asbestos and dioxin results will be forwarded upon Moretrench’s receipt of same.
Very truly yours,
MORETRENCH AMERICAN CORPORATION
John F. Donohoe
President
cc: Billy Klingler, MTA