NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 28%

Daytime daily workforce and equipment details for World Trade Center project, Dec 15, 2001.

NYC-WTC_000322830
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTR/CTING CORP. ISMS 6th Road, Whitestont . N.Y. 11357-(718) 767-9000 DATE; DECEMBER 15, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

__________ ;________ j__________________ Job Name & Location; World Trade Center I Contract No. Weather Conditions ‘ I I______ __________ ! [ Labor CLASSIFICATON y I Equipment QUANT. | IF Description MANNED STANDBY IDLE SUPERINTENDENT ■■■ 1 I|CAT 966 LOADER 1 PROJECT ENGINEER i [p[[c at 446 backhoe" 1 cat 973 LOADER 1 OFFICE ENGINEER , FOREMEN 1 [CAT365GRAPPLER 1 SAFETY OFFICER ( 1 [cat 375 GRAPPLER 1 [hITACHI 750 GRAPPLER ' 1 LABORERS 22 1 [HITACHI 650 GRAPPLER 1 IRON WORKERS LOCAL 14 7 [HITACHI 550 GRAPPLER ' 1 LOCAL 15 [HITACH11200 GRAPPLER 1 10 CARPENTER_____ J_____________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS •; 2 TOOL TRUCK HOUSE WRECKERS . 9 TOOLVAN 1 ROLL OFF dump TRAILERS LOW BED TRAILER ^DELIVERIES: HIGH DECK TRAILERS IIWELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 GRACE AREA: 17_________ OFFICE TRAILER/GENER. 1 EUKES: 79_______________ CARGO BOXES 4 FLATBEDS DOWNSTAIRS: 9 FLAT TRUCK 1 TULLY FLATBEDS: 22 PUMP 2 [roller ~ 1 RAINMAKER/GENIE LIFT 1

Description of Work:_________________ _______________________ _ COMPLETED WORK ________________________________________ __ MANNED TARPING AND TRIMMING STATIONS____________________ MANNED WATER STATIONS FOR DUST CONTROL_________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________ __ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 ELEVATIONS: ALL MACHINES LEVEL B-5 253_____________________ DELAYS: 7-830 AM SAFETY MEETING FOR ALL 14 AND 15 MEN

GRACE CONTRACTING CORP Approved By: Title; ~BY: Por: superintendent

DAILY WORK FORCE REPORT 1215D.xls i

CITY_21MC100_010445003

NYC-\/VTC_000322830

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322830Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000290105

Daily workforce details for World Trade site, Dec 20 2001.

Similar indexed content

Compare copies and versions →