NYC-WTC_000291370
Day shift daily work force report for World Trade Center site, Dec 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗Final daily workforce and equipment roster for World Trade Center project site, Dec 11, 2001.
NYC-WTC_000322828OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE contracting CORP. 51-45 6th Road, Whileston !. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 11,2001 (DAY ) FINAL DAILY WORK FORCE REPORT
Job Name & Locatioh: World Trade Center Contract No. Weather Conditions |
Labor I Equipment CLASSIFICATION QUANT. IFI Description ' MANNED STANDBY IDLE SUPERINTENDENT : 2 I|CAT 966 LOADER 1 PROJECT ENGINEER 2 II'CAT 446 BACKHOE ‘ 1 OFFICE ENGINEER j CAT 973 LOADER ~ 1 FOREMEN 1 1 CAT365GRAPPLER ' ~ 1 SAFETY OFFICER [ 1 CAT375GRAPPLER ' ~ 1 LABORERS 22 HITACHI 7S0 GRAPPLER~ 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER , 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK ' 2 MECHANICS 2 TOOLTRUCK 1 HOUSE wreckers' 8 [tool VAN 1 [ROLL OFF ~~ --------------------------- i--------------------- DUMP TRAILERS ~ --------------------------- !______________ LOW BED TRAILER DELIVERIES: TRIBORO HARDWARE HIGH DECK TRAILERS' AWIS0O WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS g LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS ~ 10 WHEEL DUMP TRUCK DEUWS: ENTIR.E JOB SHUT DOWN FOR 1 HOUR FLASHING ARROW BOARD 1 • DUE T,b MEMORIAL SERVICE OFFICE TRAILER/GENER. 1 [CARGO BOXES ~ 3 FLAT TRUCK 1 PUMP 2 [ROLLER ~~ 1 RAINMAKER/6ENIE LIFT 1 ■ I H Description of Work: _________________________ DELAYS 1200 down 11 AM ALL DAY TO SEARCH FOR PORr AUTHORITY POUCE OFFICER LOAD OUT STEEL AND DEBRIS______________________________________ _ MANNED TARPING AND TRIMMING STATIONS____________ _______________________ _ MANNED WATER STATIONS FOR DUST CONTROL ' ~ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS__________________________ ____ ______________________ ELEVATIONS: ALL MACHINES LEVEL B-S 253 _____________ _________________________ LOADS OUT 50 YUKE LOADS 48 GRACE CONTI?^CTI :OI Approved By: Title: ~ BY: V y + For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1211D.xls
CITY_21MC100_010445000 N YC-WT C_000322828
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000291370
Day shift daily work force report for World Trade Center site, Dec 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305392
Nightly final workforce and equipment listing for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305097
Night final daily workforce at World Trade; Feb 8, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291378
December 6, 2001 day final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322599
Day final workforce and equipment listing for World Trade site, Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251806
Daily workforce report listing crew and equipment at World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356733
Final daily workforce and equipment for World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280761
Night shift workforce and machinery at World Trade Center, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269236
Day preliminary daily workforce and equipment at World Trade site, Jan 11, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000291370
Day shift daily work force report for World Trade Center site, Dec 11, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305392
Nightly final workforce and equipment listing for World Trade Center project.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305097
Night final daily workforce at World Trade; Feb 8, 2002.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291378
December 6, 2001 day final daily work force report for World Trade Center site.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000291370
Day shift daily work force report for World Trade Center site, Dec 11, 2001.
Similar indexed content
NYC-WTC_000388456
Daily workforce roster for World Trade Center project, December 5, 2001.
Similar indexed content
NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
Similar indexed content
NYC-WTC_000305392
Nightly final workforce and equipment listing for World Trade Center project.
Similar indexed content
NYC-WTC_000305097
Night final daily workforce at World Trade; Feb 8, 2002.
Similar indexed content