Grace daily workforce log, Oct 2001 END

Machine-extracted title · confidence 37%

End-of-period daily workforce and equipment at World Trade Center site.

NYC-WTC_000322806
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ■ ' >5 6ih Road. Wliileslone, N Y 11357-(718) 767-9000 DATE; 10/17/01 DAY END

DAILY WORK FORCE REPORT i Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANTIT Description MANNED IDLE SUPERINTENDENT 2 ‘ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 2 FOREMEN 1 ' CAT 245 GRAPPLER 1 S-AFETY OFFICER 1 ' CAT 235 GRAPPLER 2 LABORERS 21 ' HITACHI 750 1 ll-•C•N WORKERS 1 ‘ HITACHI 550 GRAPPLER 2 LOCAL 14 6 ■ HITACHI 1200 1 LOCAL 15 9 ' COMPACTION TRUCK CARPENTER ■ MECHANICS TRUCK 2 CARPENTER FOREMAN 2 'TOOL TRUCK 1 TEAMSTERS 16 ■ TOOL VAN 1 MECHANICS 2 ■ DUMP TRAILERS 9 HOUSE WRECKERS 6 LOW BED TRAILER HIGH DECK TRAILERS e WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 5 DELIVERIES LIGHT TOWERS 6 AWisCO ACETYLENE & OXYGEN I PARTS TRUCK ■ ~~ 1 AWISCO CYLINDER RISERS DUMP TRUCKS TRIBORO MISC HARDWARE 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE(MED) 10 ACETELYNE (LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3

Description of Work:__________________________________________________________ _____________________________ REtJOVE DEBRIS FROM NORTH OF TOWER 2 wnCN HAUL ROAD INTO PLAZA & REMOVE DEBRIS FROM PLAZA_______________________________________ BE i'dGED haul rd TO NORTH SIDE OF VISTA HOTEL ______________________________________________ MANNED WATER HOSES FOR DUST CONTROL__________________________________________ ________________ MAN TARPING AND OVERHANG STATION_______________ _____________________________________________ _ MAitlTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________ __ __________________________________ 2 HOUR DELAY 3:30-5:30 PM ASSIST FIRE DEPT. WITH EXCAVATION FOR STAIRWELL IN NE CORNER OF TOWER 2 Li.'AOS OUT 93 (69 ON GRACE TRUCKING) GRACE CONTR/1GTINGCOER \ i Ay-eeved By: i T;!,;; J_^..----------- a

CITY_21MC100_010444962

NYC-WTC_000322806

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322806Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280700

Daily workforce report for World Trade site showing personnel and machines.

Similar indexed content

NYC-WTC_000408021

Final daily workforce report for World Trade Center project.