NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional work authorization, Trade Center

Machine-extracted title · confidence 28%

Owner/contractor details and job number for extra work.

NYC-WTC_000322638
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Z" ADDITIONAL WORK AUTHORIZATION twsoAy MAZZOCCHi WRECKING 32 WILLIAMS PARKWAY P. O. BOX 331 EAST HANOVER, NJ 07936-0331 PHONE: (973) 884-8682 Mvs+iin FAX: (973) 377-7464 OWNER’S PHONE / y name Evergreen Recycling Of Corona (EROC) [718] 446-7000 STREET JOB NAME Ijcb number Willets Point Boulevard World Trade Center CITY STATE STREET Corona Mew York EXISTING CONTRACT NUMBER DATE OF EXISTING CONTRACT CITY STATE Mew York City New York You are authorized to perform the following specifically described additional work; Z. Cat 246 Skid Steer I ? I Hitachi 450 w/Grapp1e 1 Campbell Housfeld Compressor 17. Hitachi 550 w/Grappie / Ingersoll Raml AirCompressor 2- Hitachi 750 w/Grapple V'Z I Miller Maintenance Trailers I 7. Hitachi 1200 w/Grapple 1 Welders Maintenance Trailers . I.. Mobile Power Hasher I 2^ Z Mechani cs wy^ervRe Trucks tX t 2- Roll-Off Truck(s) JL Atl« Forjc Lift (32E) 7. 1 3 Service Trucks I 2- Foreman y' Man Basket Burners Tractor Trailer(s) 50 CY Laborers \£ Tractor Trailer(s) Low Bed Z Mechani cs jZ zs. I Kobe!co 850 L2. __L_ Offers / Melrose 853 Bobcat '7 Operators 12. *2. Working Supervisors _ iz i Brokk 250 Robot IZ 1 Safety Supervisors Generatorfs) I k i Truck Drivers I I ..... JL_ ADDITIONAL CHARGE FOR ABOVE WORK IS: $ Payment will be made as follows:

Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.

Date Authorizing Signature z pce. Xxw-r (OWNER SIGHS HERE)

hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price.

•jrized Signature Date (CONTRACTOR SIGNS HERE)

I^THIS IS CHANGE ORDER NO. _ NOTE: This Rovision becomes part of. and In conformance with, the existing contract. z CITY_21MC100_008143524

NYC-WTC_000322638

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322638Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000322618

Job and contractor details for Trade Center additional work.

Similar indexed content

Compare copies and versions →