GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone. N.Y. 11357.(718)787-9000 DATE: 1/17/02 NIGHT PRELIMINARY 7:00 PM DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 GAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 10 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS MECHANICS TRUCK 1 1 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 2 TOOL VAN FUEL TRUCK DRIVER 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 5 FLAT TRUCK 1 PUMP 2
Description of Work: ANTICIPATED WORK___________________________________________________________________________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WEST SIDE HIGHWAY CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEWBRIDGE. MANNED WATERING STATIONS FOR DUST CONTROL MAINTAINED TRAFFIC INTO AND OUT OF AREA LOADS OUT; EUKES OUT:
GRACE CONTRACTING CORP| Approved By: BY: Title;_______ ______ Q SUPERINTENDENT .-^ — ------- For:
DAILY WORK FORCE REPORT0117N.xls
CITY_21MC100_004541488
NYC-WTC_000322577
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305164
Night final daily workforce and equipment at World Trade site, January 2002.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290069
Night preliminary daily workforce and equipment for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419302
Day final daily workforce report with manpower and CAT/HITACHI equipment at World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356542
Night final daily workforce and equipment roster for World Trade site, Jan 12, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237642
Night shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 8, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305124
Daily labor/equipment summary for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305333
Preliminary daily workforce log for World Trade Center site, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356553
Daily labor/equipment roster for World Trade site, Jan 18, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269226
Night preliminary daily workforce and equipment at World Trade site, Jan 9, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291343
Day final workforce and equipment for World Trade Center, Feb 5, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305154
Night shift daily workforce and equipment at World Trade site, Jan 13, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305164
Night final daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290069
Night preliminary daily workforce and equipment for World Trade Center project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419302
Day final daily workforce report with manpower and CAT/HITACHI equipment at World Trade Center.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356542
Night final daily workforce and equipment roster for World Trade site, Jan 12, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237642
Night shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 8, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305164
Night final daily workforce and equipment at World Trade site, January 2002.
Similar indexed content
NYC-WTC_000290069
Night preliminary daily workforce and equipment for World Trade Center project.
Similar indexed content
NYC-WTC_000419302
Day final daily workforce report with manpower and CAT/HITACHI equipment at World Trade Center.
Similar indexed content
Night final daily workforce and equipment roster for World Trade site, Jan 12, 2002.
Similar indexed content
NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
Similar indexed content