GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1-8-02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS 19 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; BLACK BEAR HIGH DECK TRAILERS WELDING TRUCK 1' FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 RAINMAKEFVGENIE LIFT 1
Description of Work: ANTICIPATED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_____________________ MAN WATERING STATIONS FOR DUST CONTROL___________________________________________________ LOADS OUT: 139 EUKESOUT: 231
GRACE CONTRACTING CORP| Approved By: BY: Title: For; SUPERINTENDENT
DAILY WORK FORCE REPORT0108D.xls
CITY_21MC100_004560467
NYC-WTC_000322166
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305146
Day shift daily workforce and equipment at World Trade site, Jan 9, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279960
Daily workforce summary with equipment and personnel at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290069
Night preliminary daily workforce and equipment for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305151
Day shift daily workforce and equipment at World Trade site, Jan 12, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267215
Daily workforce and equipment assignments for World Trade Center project on Jan 7, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305333
Preliminary daily workforce log for World Trade Center site, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305252
Day final daily workforce report for World Trade Center site, listing crews and machinery.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000246753
Daily workforce roster for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237642
Night shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 8, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360509
Day preliminary daily workforce record for World Trade Center project, Feb 28, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305146
Day shift daily workforce and equipment at World Trade site, Jan 9, 2002.
Similar indexed content
NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
Similar indexed content
NYC-WTC_000279960
Daily workforce summary with equipment and personnel at World Trade Center project.
Similar indexed content
NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
Similar indexed content
NYC-WTC_000290069
Night preliminary daily workforce and equipment for World Trade Center project.
Similar indexed content