Daily work force report, World Trade site, Jan 2002

Machine-extracted title · confidence 40%

Night preliminary daily workforce and equipment roster for World Trade site.

NYC-WTC_000322164
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISMS 6th Road. Whitestone. N.Y. 11367-(716)787-8000 DATE: 1-8-02 NIGHT PRELIMINARY

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

aa Ubor Equipment CLASSIFICATION QUANT. Descriptton MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER “ CAT973 LOADER 1 FOREMEN 2 " CAT365GRAPPLER 1 SAFETY OFFICER “ CAT 375 BUCKET 1 LABORERS 17 ICAT375GRAPPLER ~ 1 IRON WORKERS IHITACHI7S0 GRAPPLER ~ 1 LOCAL 14 5 jHiTACHI 550 BUCKET 1 LOCAL 15 9 IhITACHI 1200 GRAPPLER~ 1 CARPENTER il85CFM COMPRESSOR 1 CARPENTER FOREMAN HAMMER HOE RAM 1 TEAMSTERS 1 ImECHANICS TRUCK 1 1 MECHANICS 1 TOOLTRUCK HOUSE WRECKERS 6 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 'rainmaker/genie lift 1

Description of Work: ____________________________________________________________________________ ANTICIPATED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT I MAINTAIN TRAFFIC FLOW INTO AND,OUT OF AREA - “ -------------- --- - - ----------- ------------ -I ■

MAN WATERING STATIONS FOR DUST CONTROL LOADS OUT: EUKES OUT:

GRACE CONTRACTING CORP| Approved By: BY: Title: For: SUPERIN' IT

DAILY WORK FORCE REPORTClCSN.,xls

CITY_21MC100_004560340

NYC-WTC_000322164

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322164Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000199931

Preliminary daily report from Grace Contracting Corp. listing workforce and equipment usage at the World Trade Center site in January 2002.

Similar indexed content

Compare copies and versions →