NYC-WTC_000290068
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment for World Trade Center site, January 13, 2002.
NYC-WTC_000322154OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
•S
GRACE CONTRACTING CORP. 191-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1-13-02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 3 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS 20 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 760 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 7 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 [MECHANICS TRUCK 2 MECHANICS 3 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMPTRAILERS LOW BED TRAILER DELIVERIES: HIGH.DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 7 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2.5 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work: COMPLETED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL EXPOSING THE PATH TRAINS 2 MACHINES LEVEL B-6, EL 242, 3 MACHINES AT LEVEL 8-5, EL253_____________________________________ LOADS OUT: 81 EUKESOUT: 172
GRACE COnIrACTING CORP| / Aoproved By: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0112D.xls
CITY_2IMCl0 0_0 01415 8 81 NYC-WTC_000322154
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290068
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302408
Day final daily workforce and equipment for World Trade Center site, February 21, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305250
Day final daily workforce report for World Trade Center site, listing crews and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322166
Day final daily workforce and equipment details for World Trade site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305154
Night shift daily workforce and equipment at World Trade site, Jan 13, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305151
Day shift daily workforce and equipment at World Trade site, Jan 12, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290061
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305391
Day final update of workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305529
Night preliminary daily workforce report with crew and equipment at World Trade site.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322113
Daily labor roster and equipment assignments for the World Trade Center project site, dated 1-12-02.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360900
Daily workforce roster for World Trade site, listing crews and equipment for Jan 15, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000290068
Day final daily workforce and equipment at World Trade Center site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302408
Day final daily workforce and equipment for World Trade Center site, February 21, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305250
Day final daily workforce report for World Trade Center site, listing crews and equipment.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322166
Day final daily workforce and equipment details for World Trade site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305154
Night shift daily workforce and equipment at World Trade site, Jan 13, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290068
Day final daily workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000302408
Day final daily workforce and equipment for World Trade Center site, February 21, 2002.
Similar indexed content
NYC-WTC_000305250
Day final daily workforce report for World Trade Center site, listing crews and equipment.
Similar indexed content
NYC-WTC_000290067
Day final daily workforce and equipment at World Trade Center project.
Similar indexed content
NYC-WTC_000322166
Day final daily workforce and equipment details for World Trade site.
Similar indexed content