NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 42%

Day final daily workforce and equipment listing for World Trade Center project, December 11, 2001.

NYC-WTC_000322146
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

J

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 11,2001 (DAY ) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor 2ZZZ1 [ Equipment Description MANNED STANDBY IDLE CLASSIFICATIONQUANT. SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 [IMECHANICS TRUCK 2 MECHANICS 2 1TOOL TRUCK 1 HOUSE WRECKERS 8 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: TRIBORO HARDWARE ■ HIGH DECK TRAILERS AWISCO ■ WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 9 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK DELAYS: ENTIRE JOB SHUT DOWN FOR 1 HOUR ■ FLASHING ARROW BOARD 1 DUE TO MEMORIAL SERVICE ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 ■ FLAT TRUCK - IPUMP ~ 2 [ROLLER ~ 1 1RAINMAKER/GENIE LIFT 1

Description of Work: DELAYS 1200DOWN 11 AM ALL DAY TO SEARCH FOR PORT AUTHORITY POLICE OFFICER LOAD OUT STEEL AND DEBRIS____________________________________________________ MANNED TARPING AND TRIMMING STATIONS_______________________________________ MANNED WATER STATIONS FOR DUST CONTROL____________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTAIXATIONOFGPS SYSTEMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 LOADS OUT 50 YUKE LOADS 48 GRACE CONTRACTlNtr6o^ Approved By; Tide: -byA For SUPERINTENDENT

DAILY WORK FORCE REPORT 1211 D.xls

CITY_21MC1OO_OO3131498

NYC-WTC_000322146

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322146Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →