NYC-WTC_000322118OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document ■ ■ . ■
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 787-9000 DATE: 2/19/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Cehter Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. ________ Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER FOREMEN 1 CAT 365 GRAPPLER PROJECT ENGINEER 2 CAT 375 GRAPPLER SAFETY ENGINEER 1 CAT 375 BUCKET 1 LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 1200 GRAPPLER 1 LOCAL 14 2 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 2 235 HAMMER HOE RAM i CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK 1 DELIVERIES: AWISCO FUEL TRUCK 1 PICKUP TRUCKS 6 NOTE: LIGHT TOWERS RAN 1,5 HOURS LIGHT TOWERS 5 SITE MULE 2 1 DUMP TRUCKS 110 WHEEL DUMP TRUCK “ FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FIAT TRUCK 1 PUMP 2
□as Description of Work: PRELIMINARY/ANTICIPATED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 85
GRACE CONTRACTING CORP |
2 Approved By: BY: Title: For: SUPERINTENOEN'
DAILY WORK FORCE REPORT0219D.xls
CITY_21MC100_003132666
NYC-WTC_000322118
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000291311
Monday final daily workforce report for World Trade Center project with equipment.
1 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243996
Day shift workforce and equipment summary for World Trade site, Feb 21, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266656
Daily workforce roster for World Trade Center site shift, Grace Contracting.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266662
Day shift daily workforce roster for World Trade Center site, Grace Contracting.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429472
Day shift workforce and equipment for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306048
Daily workforce report listing labor classifications and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389408
Grace Contracting day final daily workforce report for World Trade site dated Feb 19, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291344
Night final daily workforce and equipment for World Trade Center, Feb 5, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360498
Day shift workforce and equipment roster for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278698
Day final staffing and equipment counts for World Trade, Feb 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291343
Day final workforce and equipment for World Trade Center, Feb 5, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305136
Daily workforce and equipment at World Trade site, Feb 14, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000243996
Day shift workforce and equipment summary for World Trade site, Feb 21, 2002.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266656
Daily workforce roster for World Trade Center site shift, Grace Contracting.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266662
Day shift daily workforce roster for World Trade Center site, Grace Contracting.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429472
Day shift workforce and equipment for World Trade Center construction.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306048
Daily workforce report listing labor classifications and equipment at World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389408
Grace Contracting day final daily workforce report for World Trade site dated Feb 19, 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000291311
Monday final daily workforce report for World Trade Center project with equipment.
Similar indexed content
NYC-WTC_000243996
Day shift workforce and equipment summary for World Trade site, Feb 21, 2002.
Similar indexed content
NYC-WTC_000266656
Daily workforce roster for World Trade Center site shift, Grace Contracting.
Similar indexed content
NYC-WTC_000266662
Day shift daily workforce roster for World Trade Center site, Grace Contracting.
Similar indexed content
NYC-WTC_000429472
Day shift workforce and equipment for World Trade Center construction.
Similar indexed content