NYC 9/11 Public Portal Document
Jessica Leighton - RA_sitrepO4-18.wpd Page 2 j
present in these air samples at levels sufficiently above those in the control
samples to be considered a valid result.
o Data is not attached.
NYC / ER (Mar 10) - Asbestos Monitoring (Particulate Monitoring Stations - 'Extended
Network’)
o Results pending.
NYC / ER (Apr 4) - Asbestos Monitoring (Particulate Monitoring Stations - 'Extended
Network’)
o Monitoring sites include:
Park Row (Site 1)
Chambers St./West St. (Site 2)
Public School 154: 333 East 135*^ St Bronx (Site 5)
Intermediate School 143: 511 West 182- St., Manhattan (Site 6)
Public School 274: 800 Bushwick Ave., Brooklyn (Site 7)
Public School 44: 80 Maple Parkway, Staten Island (Site 8)
Public School 199: 3290 - 48- Ave., Queens (Site 9)
o During this period a total of 7 samples were collected from these monitoring
sites.
o All of the samples were below the TEM AHERA standard.
NYC / ER (Apr 7) - Asbestos Monitoring (Particulate Monitoring Stations - 'Extended
Network’)
o Results pending.
NYC / ER (Apr 17) - Volatile Organics (Mobile Laboratory)
o Numerous volatile organic compounds were detected at the South Tower in a
sample collected from the ground surface of the ongoing excavation activities.
o Two volatile organic compounds were identified in samples collected at the
North Tower and Austin Tobin Plaza.
CITY_21MC100_002458725
NYC-WTC_000321036
OCR can misread numbers and units. Confirm readings against the page image before using them.