MS 89 PS8 occupancy follow-up, post-WTC response

Machine-extracted title · confidence 35%

Document describing MS/PS 85M occupancy and recovery operations related to WTC.

NYC-WTC_000319809–000319819
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

iiiilBil lEdBralioit Of lEsetiBrs 2. A/nAnciin Cedoftobor ©f APL-CK-

50 Park Avenue SouV» ev- York. NY TO010 ti2) 777.7500 Memorandum Jonuary 22, 2002

Io: MS 89 Stofi

From: Tom Po;ppcis, UFT Director of Staff Ron Jones, UFT Vice President Elementary Schools Jerry Goldman, UFT Monhottan Borough Representotive SlewQrt Cohen. uFT Monhatton District 2 Representative Klous Bornemon. UFT Health and Sof ety Speciol Representative Ellie Engler & Chris Proctor, UFT Industrial Hygienists

Re; Re-Occupying MS/PS S9M

Following the disaster at the World Trade Center on September 11, 2001, the New York City Board of Education closed MS/PS 85M becouse it was located in the frozen zone (i.e., the area that was closed off to the public to facilitate the City's recovery and cleanup effort). The oreo where the school is locoted hos been occcssibic to the public since early October 2001. The school was used by the New York City Office of Emergency Monagement for rescue ond recovery operations until November 16. 2001 when it was returned to the Board of Educotion.

Right after the disaster, the Union worked with the Board of Education (BOE) to develop ond implement inspection, environmental monitoring and clean-up protocols ot the school. The BOE assessed the building's structural strength ond stability as well os the gas, clectricol and water service and the New York City Fire Department inspected the fire and life sofety alarm systems. The BOE directed the School Construction Authority (SCA) to conduct cleanup and air monitoring of the building.

In December 2001 and January 2002, the Union inspected the school olong with representatives from the BOE Division of School Facilities Environmental Health ond Safety (BOE DSF EH5), Burns and Roe. a heating, ventilation, and air- conditioning consultant for BOE DSF, the SCA. and the third party air monitoring firm (ATC Associates) for BOE DSF. The visual inspection included an examination of the ventilotion system including the mechanical equipment rooms end air-handling units, classroom unit ventilotors (unitvents), the roof, random ctossrooms ond rooms on eoch floor as well os outside the school, including the playground.

Re-Opening 1/22/02 1 A!i:ii8ieo tv'ih me /vew Voc* Siaie New York C'ly Cera's' i.ebci- Counci' sna I'^e New Yci/h Ztue binned Teochcis

------- 2£)'u Cb«C'T c naj rrir.:’ rr., CITY_21MC100_011095648

NYC-WTC_000319809

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000319809Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

Compare copies and versions →