NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Federal Register / Vol. 52, No, 83 / Thursday, April 30, 1987 / Proposed Rules 15873

or from a short length of duct, a glove result of the vibration created by the Maintenance Program bag may not be either large enough or of power saws used to cut the pipe. If the proper shape to enclose the work An asbestos maintenance program i possible, the pipes should be cut at must be initiated in all facilities that. area. In such cases, a minienclosure can locations that are not insulated to avoid have asbestos-containing materials. be built around the area where small- disturbing the asbestos. If a pipe is scale, shortduration asbestos completely insulated with asbestos- Such a program should include:

b maintenance or renovation work is to be containing materials, small sections performed. Such enclosures should be constructed of 8-mil-thick polyethylene plastic sheeting and can be small should be stripped using the glove-bag method described above before the pipe is cut at the stripped sections. 1. Development of an inventory of all asbestos-containing materials in the facility. 2. Periodic examination of all enough to restrict entry to the asbestos asbestos-containing materials to detect work area to one worker. Enclosure deterioration. For example, a mini-enclosure can be The decision to enclose rather than 3. Written procedures for handling built in a small utility closet when remove asbestos-containing rfiaterial asbestos materials during the asbestos-containing duct covering is to from an area depends on the building performance of small-scale, short- IJ , be removed. The enclosure is owner’s preference, i.e., for removal or ■ duration maintenance and renovation constructed by: containment. Owners consider such activities. J 1. Affixing plastic sheeting to the factors as cost effectiveness, the 4. Written procedures for asbestos walls with spray adhesive and tape. physical configuration of the work area, disposal.. 2. Covering the floor with plastic and and the amount of traffic in the area 5. Written procedures for dealing with i sealing the plastic covering the floor to when determining which abatement asbestos-related emergencies. the plastic on the walls. method to use. Members of the building’s 3. Sealing any penetrations such as If the owner chooses to enclose the maintenance engineering staff pipes or electrical conduits with tape. structure rather than to remove the ■ (electricians, heating/air conditioning 4. Constructing a small change room asbestos-containing material insulating engineers, plumbers, etc.) who may be (approximately 3 feet square) made of 6- it, a solid structure (airtight walls and required to handle asbestos-containing mil-thick polyethylene plastic supported ceilings) must be built around the materials should be trained in safe by 2-inch by 4-inch lumber (the plastic asbestos covered pipe or structure to procedures. Such training should include should be attached to the lumber prevent the release of asbestos- ■ at a minimum: supports with staples or spray adhesive. containing materials into the area 1. Information regarding types of ACM . and tape). beyond the enclosure and to prevent and its various uses and forms. The change room should be disturbing these materials by casual 2. Information on the health effects contiguous to the mini-enclosure, and is contact during future maintenance associated with asbestos exposure. necessary to allow the worker to operations. 3. Descriptions of the proper methods vacuum off his protective coveralls and Such a permanent (i.e., for the jife of of handling asbestos-containing remove them before leaving the work the building) enclosure should be built area. While inside mini-enclosure, the materials. of new construction materials and worker should wear Tyvek* disposable should be impact resistant and airtight. • 4. Information on the use of HEPA- coveralls and use the appropriate Enclosure walls should be made of equipped dual-cartridge respirators and HEPA-filtered dual-cartridge or more tongue-and-groove boards, boards with other personal protection during protective respiratory protection. spine joints, or gypsum boards having maintenance activities. f The advantages of mini-enclosures . taped seams. The underlying structure Prohibited Activities. are that they limit the spread of must be able to support the weight of the asbestos contamination, reduce the enclosure. (Suspended ceilings with The training program for the potential exposure of bystanders and laid-in panels do not provide airtight maintenance engineering staff should other workers who may be working in enclosures and should not be used to . describe methods of handling asbestos­ adjacent areas, and are quick and easy enclose structures covered with containing materials as well as routine to install. The disadvantage of mini­ asbestos-containing materials.) All maintenance activities that are enclosures is that they may be too small joints between the walls and ceiling of prohibited when asbestos-containing to contain the equipment necessary to the enclosure should be caulked to materials are involved. For example, create a negative pressure within the prevent the escape of asbestos fibers. maintenance staff employees should be 1- instructed: enclosure: however the double layer of During the installation of enclosures, plastic sheeting will serve to restrict the tools that are used (such as drills or, 1. Not to drill holes in asbestos­ release of asbestos fibers to the area rivet tools) should be equipped with containing materials. outside the enclosure. HEPA-filtered vacuums. Before, 2. Not to hang plants or pictures on constructing the enclosure, all electrical structures covered with asbestos- Removal of Entire Structures conduits, telephone lines, recessed containing materials. When pipes are insulated with lights, and pipes in the area to be 3. Not to sand asbestos-containing asbestos-containing materials, removal enclosed should be moved to ensure that floor tile. of the entire pipe may be more the enclosure will not have to be re­ 4. Not to damage asbestos-containing protective, easier, and more cost- opened later for routine or emergency materials while moving furniture or effective than stripping the asbestos maintenance. If such lights or other other objects. • insulation from the pipe. Before such a . equipment cannot be moved to a new , 5. Not to install curtains, drapes, or 1 ■ pipe is cut, the asbestos-containing location for logistic reasons, or if moving dividers in such a way that they damage insulation must be wrapped with 6-mil them will disturb the asbestos- asbestos-containing materials. polyethylene plastic and securely scaled containing materials, removal rather 6. Not to dust floors, ceilings, moldings • with duct tape or equivalent. This than enclosure of the asbestos­ or other surfaces in asbestos- plastic covering will prevent asbestos containing materials is the appropriate . contaminated environments with a dry fibers from becoming airborne as a control method to use. brush or sweep with a dry broom.

NYC-WTC_000318809

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318809Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →