NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
27 shared non-person entities · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Background report on asbestos and related contaminants for WTC environment, 1987.
NYC-WTC_000318755–000318818OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Federal Register / Vol. 52, No. 83 / Thursday, April 30, 1987 / Proposed Rules 15871
IX. References provisions of this appendix when ii. Removal of entire asbestos (1) “Guidance for Controlling Asbestos performing small-scale, short-duration insulated pipes or structures. Containing Materials in Buildings," EPA 590/ O&M activities. iii. Use of mini-enclosures. r ■■ 5-85-024, June 1385. (2) “Measuring Airborne Asbestos Definition of Small-Scale, Short- 3. Enclosure of asbestos materials. Following an Abatement Action," USEPA, Duration Activities 4. Maintenance programs. Office of Toxic Substances, EPA 600/4-85- For the purposes of this appendix, This appendix describes these 049,1985. small-scale, short-duration maintenance controls and work practices in detail. (3) Small, John and E. Steel, "Asbestos Standards: Materials and Analytical activities are tasks such as, but not Preparation of the Area Before Methods," N.B.S. Special Publication 619, limited to: 1. Removal of asbestos-containing Renovation or Maintenance Activities 1982. (4) Campbell, W.J.. R.L. Blake, LL Brown, insulation on pipes. The first step in preparing to perform E.E. Cather, and J;J. Sjoberg, “Selected 2. Removal of small quantities of a small-scale, short-duration asbestos Silicate Minerals and Their Asbestiform asbestos-containing insulation on beams renovation or maintenance task, Varieties.” Information Circular 8751, U.S or above ceilings. Bureau of Mines, 1977. regardless of the abatement method that 3. Replacement of an asbestos- will be used, is the removal from the ■ (5) “Quality Assurance Handbook for Air containing gasket on a valve. Pollution Measurement Systems. Ambient Air work area of all objects that are Methods,” EPA 600/4-77-027a, USEPA. 4. Installation or removal of a small movable to protect them from asbestos ■ Office of Research and Development, 1977. section of drywall. 5. Installation of electrical conduits contamination. Objects that cannot be (6) Method 2A Direct Measurement of Gas removed must be covered completely Volume Through Pipes and Small Ducts." 40 through or proximate to asbestos- CFR Part 60. Appendix A. containing materials. with 6-mil-thick polyethylene plastic (7) Burdette. G.J.. Health & Safety Exec. Small-scale, short-duration sheeting before the task begins. If Research & Lab. Services Div.. London. maintenance activities can be further objects have already been “Proposed Analytical Method for defined, for the purposes of this subpart, contaminated, they should be Determination of Asbestos in Air." by the following considerations:, thoroughly cleaned with a High (8) Chatfield. E.J.. Chatfield Tech. Cons.. 1. Removal of small quantities of Efficiency Particulate Air (HEPA) Ltd.. Clark. T.. PEI Assoc.. “Standard Operating Procedure for Determination of asbestos-containing materials (ACM) filtered vacuum or be wet-wiped before Airborne Asbestos Fibers by Transmission only if required in the performance of they are removed from the work area or Electron Microscopy Using Polycarbonate . another maintenance activity not completely encased in the plastic. Membrane Filters." WERL SOPO 87,-1. March intended as asbestos abatement. S. 1987. 2. Removal of asbestos-containing Wet Methods (9) NIOSH 7402 Method for Asbestos thermal system insulation not to exceed Whenever feasible, and regardless of Fibers. 12-11-86 Draft. amounts greater than those which can (10) Yamate. G.. Agarwal, S.C., Gibbons, , the abatement method to be used (e.g., R.D., nTRI, "Methodology for the be contained in a single glove bag. removal, enclosure, use of glove bags), Measurement of Airborne Asbestos by 3. Minor repairs to damaged thermal methods must be used during small- Electron Microscopy,” Draft report, Gontract system insulation which do not require scale, short-duration maintenance and 68-02-3266, July 1984. removal. ' r.' (11) "Guidance to the Preparation of Quality Assurance Project Plans." USEPA. Office of Toxic Substances. 1984. 4. Repairs to a piece of asbestos containing wallboard. 5. Repairs, involving encapsulation, renovation activities that involve disturbing asbestos-containing materials. Handling asbestos materials enclosure or removal, to small amounts wet is one of the most reliable methods Appendix B to Subpart E—Work of ensuring that asbestos fibers do not Practices and Engineering Controls for of friable asbestos-containing material only if required in the performance of become airborne, and this practice I Small-Scale, Short-Duration Operations Maintenance and Repair (O&M) emergency or routine maintenance should therefore be used whenever
I i Activities Involving ACM This appendix is not mandatory, in activity and not intended solely as feasible. Wet methods can be used in asbestos abatement. Such work may not the great majority of workplace exceed amounts greater than those situations. Only in cases where asbestos that local education agencies may which can be contained in a single work must be performed on live choose to comply with all the prefabricated mini-enclosure. Such an electrical equipment, on live steam lines, requirements of 40 CFR 763.121. Section enclosure shall conform spatially and or in other areas where water will 763.91(b) extends the protection geometrically to the localized work area, seriously damage materials or provided by EPA in its 40 CFR 763.121 in order to perform its intended equipment may dry removal be for worker protection during asbestos containment function. performed. Amended water or another abatement projects to employees of OSHA concluded that the use of wetting agent should be applied by local education agencies who perform certain engineering and work practice means of an airless sprayer to minimize . small-scale, short-duration operations, controls is capable of reducing employee the extent to which the asbestos f maintenance and repair (O&M) activities involving asbestos-containing materials and are not covered by the exposures to asbestos to levels below the final standard’s action level (0.1 f/ containing material is disturbed. Asbestos-containing material should cm®) (See 51 FR 22714, June 20,1986).
1 OSHA asbestos construction standard at 29 CFR 1926.58 or an asbestos worker protection standard adopted by a State as part of a State plan approved by OSHA under section 18 of the Several controls and work practices, be wetted from the initiation of the used either singly or in combination, can maintenance or renovation operation be employed effectively to reduce asbestos exposures during small and wetting agents should be used continually throughout the work period maintenance and renovation operations. ensure that any dry asbestos- Occupational Safety and Health Act. — These include: containing material exposed in the Employers wishing to be exempt from 1. Wet methods. course of the work is wet and remains the requirements of 5 763.121 (e)(6) and 2. Removal methods. wet until final disposal. (f)(2)(i) may instead comply with the i. Use of glove bags.
t J
NYC-WTC_000318807
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
27 shared non-person entities · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000438164
EPA SOP excerpts and references for asbestos validation and inspections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
26 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similar indexed content
NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
Similar indexed content
NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similar indexed content
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similar indexed content