NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 77 pages

Background study draft for WTC asbestos, 2003

Machine-extracted title · confidence 37%

Background study draft on asbestos in schools related to WTC, March 2003.

NYC-WTC_000318678–000318754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Federal Register / Vol. 52. No. 210 / Friday. October 30. 1987 / Rules and Regulations 41853

changes in the conditio: of the (1) A lial of the name and address of that the laboratory meets the applicable materials. each school building and whether the requirements of § 763.87(a) the date of (iii) Submit to the person .esignated school building contains friable ACBM, analysis, and the name and signature of to carry out general local eoucation nonfriable ACBM. and friable and the person performing the analysis. agency responsibilities under § 763.84 a nonfriable suspected ACBM assumed to (v) A description of assessments. copy of such record for inclusion in the be ACM. required to be made under i 763.88. of management plan. (2) For each inspection conducted all ACBM and suspected ACBM before the December 14.1987: assumed to be ACM, and the name. § 763.93 Management plans. (i) The date of the inspection. signature. State of accreditation, and if ■ (a)(1) On or before October 12.1968. (ii) A blueprint, diagram, or written applicable, accreditation number of each local education agency shall description of each school building that each accredited person making the develop an asbestos management plan identifies clearly each location and assessments. for each school, including all buildings approximate square or linear footage of (4) The name, address, and telephone . that they lease, own, or otherwise use as any homogeneous or sampling area number of the person designated under school buildings, and submit the plan to where material was sampled for ACM. § 763.84 to ensure that the duties of the an Agency designated by the Governor and. if possible, the exact locations local education agency are carried out. of the State in which.the local education where bulk samples were collected, and and the course name, and dates and agency is located. The plan may be the dates of collection. hours of training taken by that person to submitted in stages that cover a portion (iii) A copy of the analyses of any carry out the duties. of the school buildings under the bulk samples, dates of analyses, and a (5) The recommendations made to the authority of the local education agency, copy of any other laboratory reports local education agency regarding (2) If a building to be used as part of a pertaining to the analyses. response actions, under § 763.88(d), the school is leased or otherwise acquired (iv) A description of any response name, signature. State of accreditation after October 12,1988, the local actions or preventive measures taken to of each person making the education agency shall include the new reduce asbestos exposure, including if recommendations, and if applicable, his building in the management plan for the possible, the names and addresses of all or her accreditation number. school prior to its use as a school contractors involved, start and completion dates of the work, and (6) A detailed description of building. The revised portions of the preventive measures and response . management plan shall be submitted to results of any air samples analyzed during and upon completion of the work. actions to be taken, including methods the Agency designated by the Governor. to be used, for any friable ACBM, the (v) A description of assessments. (3) If a local education agency begins . locations where such measures and required to be made under § 763.88, of to use a building as a school after action will be taken, reasons for material that was identified before October 12,1988, the local education December 14,1987, as friable ACBM or selecting the response action or agency shall submit a management plan preventive measure, and a schedule for friable suspected ACBM assumed to be for the school to the Agency designated ACM, and the name and signature. State beginning and completing each by the Governor prior to its use as a preventive measure and response of accreditation, and if applicable, school, action. accreditation number of each accredited (b) On or before October 17,1987, the person making the assessments. (7) With respect to the person or Governor of each State shall notify local (3) For each inspection and persons who inspected for ACBM and education agencies in the Slate reinspection conducted under § 763.85: who will design or carry out response regarding where to submit their (i) The date of the inspection or actions, except for operations and management plans. States may establish reinspection and the name and maintenance, with respect to the ACBM, administrative procedures for reviewing signature. State of accreditation and. if one of the following statements: management plans. If the Governor does applicable, the accreditation number of (i) If the State has adopted a not disapprove a management plan each accredited inspector performing contractor accreditation program under within 90 days after receipt of the plan, the inspection or reinspection. section 206(b) of Title II of the Act, a the local education agency shall (ii) A blueprint, diagram, or written statement that the person(s) is implement the plan. description of each school building that accredited under such plan. (c) Each local education agency must identifies clearly each location and (ii) A statement that the local begin implementation of its management approximate square or linear footage of education agency used (or will use) plan on or before July 9,1989, and homogeneous areas where material was persons who have been accredited by complete implementation in a timely sampled for ACM. the exact location another State which has adopted a fashion. where each bulk sample was collected. contractor accreditation plan under (d) Each local education agency shall date of collection, homogeneous areas section 206(b) of Title II of the Act or is • maintain and update its management where friable suspected ACBM is accredited by an EPA-approved course plan to keep it current with ongoing assumed to be ACM. and where under section 206(c) of Title II of the operations and maintenance, periodic nonfriable suspected ACBM is assumed Act. surveillance, inspection, reinspection. to be ACM. (8) A detailed description in the form and response action activities. All (iii) A description of the manner used of a blueprint, diagram, or in writing of provisions required to be included in the to determine sampling locations, and the any ACBM or suspected ACBM management plan under this section name and signature of each accredited assumed to be ACM which remains in shall be retained as part of the inspector collecting samples, the State of the school once response actions are management plan, as well as any accreditation, and if applicable, his or undertaken pursuant to § 763.90. This information that has been revised to her accreditation number. description shall be updated as response bring the plan up-to-date. (iv) A copy of the analyses of any actions are completed. (e) The management plan shall be bulk samples collected and analyzed.- (9) A plan for reinspection under developed by an accredited the name and address of any laboratory 5 763.85, a plan for operations and management planner and shall include: that analiTsed bulk samples, a statement maintenance activities under § 763.91,

NYC-WTC_000318706

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318706Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →