NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 77 pages

Background study draft for WTC asbestos, 2003

Machine-extracted title · confidence 37%

Background study draft on asbestos in schools related to WTC, March 2003.

NYC-WTC_000318678–000318754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Federal Register / Vol. 52, No. 210 / Friday, October 30, 1987 / Rules and Regulations 41837

things, a suggested format for inspection believed this is a misrepresemtation of determination of a fiber's quantity by and management plans. In addition, EPA the true nature of the material, which is XRD. Additionally, vr'tdated methods has developed a model course for , still friable under its covering. for the use of electron .. Ic. iscopy in accreditation of inspectors and The Agency agreed with comments bulk asbestos analysis do .lOt exist at management planners which will that stale friable thermal system this time. New developments in electron provide uniforrri guidance to inspectors insulation cannot properly be “deemed" microscopy or XRD technology may lead and management planners regarding nonfriable. This constitutes an EPA to reconsider the use of these tools their responsibilities. Further, before any inaccurate depiction of the true nature for primary analysis at a future time. course is offered to accredit inspectors of this material. An undamaged jacket A number of comments sought and management planners, it must be on thermal system insulation may be clarification on the laboratory reviewed and approved by EPA in properly seen as an enclosure, which accreditation program. Two laboratory accordance with the provisions of the prevents fiber release and reduces accreditation programs are currently Model Accreditation Plan. This review hazard, but does not change the being developed by the NBS for proc&ss will help ensure that inspectors characteristics of material friability laboratories which analyze bulk and air and management planners receive behind or under the eiyclosure. samples for asbestos. The bulk uniform guidance. However, while the Agency considers accreditation program .is expected to be The Agency received comments about it inappropriate to "deem" or operational in early FY89. The air the requirement for reinspection every 3 characterize friable thermal system accreditation program is expected to be years by an accredited inspector. Some insulation as nonfriable, it is appropriate complete in late FY89. commenters supported this requirement, to "treat" this material as nonfriable. Until the NBS bulk accreditation others thought the reinspection should EPA. in its guidance and technical program is complete, EPA will establish be more frequent, still others felt that assistance activities, has traditionally an interim accreditation program for the reinspection should be less frequent treated undamaged friable thermal laboratories which analyze bulk system insulation as nonfriable. for the and that use of an accredited inspector samples by PLM. EPA will provide purposes of cleaning and other O&M was unnecessary. EPA believes a 3-year interim accreditation to laboratories activities. reinspection requirement to be which correctly identify four samples as Accordingly, the regulation at conducted by an accredited inspector is either asbestos-containing or § 763.85(c) has been modified to state nece,ssary. The Agency is concerned ncnasbestos-containing. EPA announced that thermal system insulation that has that an annual reihspection as suggested the availability of this program in the retained its structural integrity and that by some commenters would prove Federal Register of September 3.1987 has an.undamaged protective jacket or unduly burdensome to LEAs while (52 FR 33470). The deadline for wrap that prevents fiber release shall be providing limited information. The rule laboratory participation in the first treated as nonfriable. provides for periodic surveillance Ultimately, however, the change in round was September 30,1987. A formal activities at least twice a year to keep wording does not change the intent of listing of the first round of accredited track of changes in the ACBM's the regulation that thermal insulation labs will be available in January 1988. condition. On the other hand, the that has both an intact protective jacket Individual laboratories will be informed Agency believes a reinspection every 5 and has retained structural integrity of their performance by letter in years is too long a period of time for a should be subject to periodic December 1987. Laboratories which did school's ACBM not to be checked bj' an surveillance and preventive measures. not participate in the first round of accredited inspector. ACBM could and that custodial and maintenance accreditation will be considered in the deteriorate substantially over a 5-year workers must be trained to deal with second round of accreditation, which is period of time. The Agency disagrees such material. Furthermore, if the scheduled for April 1988. with comments suggesting that thermal insulation is disturbed or is X Assessment unaccredited persons should be about to be disturbed such that it would permitted to perform reinspections. be rendered friable, all applicable O&M One comment regarding assessment of Accredited inspectors will have special and response action provisions will the physical condition of the material by training to determine changes in the apply. EPA believes that this is accredited inspectors was that EPA physical condition of ACBM. The consistent with NESHAP. which should require accredited inspectors to purpose of periodic surveillance, which considers such material to be friable give reasons for their assessment may be conducted by unaccredited when disturbed or removed. conclusions. EPA agrees with the personnel, is to note observable changes comment. This requirement would in the condition of ACBM. For example. E. Bu/k Asbestos Sample Measurement provide reviewers of management plans a periodic surveillance check would Comments suggested that EPA allow at the State level with additional, useful notice a water leak through an ACBM use of electron microscopy and X-ray information in judging whether the ceiling. The Agency believes the diffraction (XRD) for the analysis of management plan accurately reflects the combination of the semiannual periodic bulk samples. condition of the school building. The ' surveillance check and the 3-year For purposes of tin's rule. PLM will be Agency believes the increase in the reinspection by an accredited inspector used for analyzing bulk samples for recordkeeping burden is small. As a provides for adequate scrutiny of ACB.M asbestos. The analytical method to be result, § 763,86(b) has been changed to present in schools. employed is the EPA "Interim Method require the accredited inspector to give Industry commenters commended the for the Determination of Asbestos in written reasons for the decision to proposed rule for allowing thermal Bulk Insulation Samples" (40 CFR 763, classify ACBM. system insulation "that has retained its Appendix A to Subpart F). EPA feels Some commenters suggested that structural integrity and that has an that the existing EPA PLM protocol is management planners should be undamaged protective jacket or wrap technically sufficient for determining required to use one assessment method that prevents fiber release" to be asbestos fiber identity and quantity. in developing recommendations for "deemed" nonfriable for the purpiises of Currently, allowance is made in the EPA LEAs about response actions, 'fhese this regulation. Others commenters PLM protocol for additional commenters suggested a variety of

NYC-WTC_000318690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →