1.0 INTRODUCTEON
TRC Engineers, Inc. (TRC) performed asbestos micro-vacuum sampling of Mayors Office of
Operations office equipment located on the 20®' floor of 100 Church Street and 4* floor of 40
Worth Street offices. Office equipment tested at 40 Worth Street has been moved to its present
location from 100 Church Street after the World Trade Center (WTC) collapse. Representative
' sampling was performed on approximately ten percent of the office equipment that was impacted
by the World Trade Center (WTC) collapse.
Office equipment tested at 100 Church Street consisted of:
o 6 copiers
o 2 CPUs
o 2 monitors
o 1 UPS
D 1 server
o 1 fax machine
o 1 plotter
Office equipment tested at 40 Worth Street consisted of;
o 3 CPUs
o 2 printers
o 1 scanner
o 1 projector
o i monitor
0 1 laptop computer
o 1 copier
o 1 fax machine
Micro-vacuum sampling was performed on December 12 and 13, 2002 by Mr. Mikhail
Shindelman of TRC. A total of twenty-eight asbestos micro-vacuum samples including three
blanks were collected from 100 Church Street and 40 Worth Street offices.