EPA/NYC cleanup plan: near-term actions

Machine-extracted title · confidence 60%

Near-term actions for cleanup, debris removal and HVAC considerations.

NYC-WTC_000317690–000317695
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EPA/NYC Indoor Air Approach DRAFT SUBJECT TO CHANGE May 20,2002 Overarching Goal: To Develop an Action Plan which contains Near and Longer Term Components. This Action Plan is designed to support NYC residents and worker populations, so they may have confidence and protection regarding any potential significant increased 1 health risks which might result from the exposure in their indoor environments on a long term basis to potential contaminants from the collapse of the WTC buildings and associated fires. Maintaining this confidence and protection with enable and enhance the economic revitalization of Lower Manhattan on an expedited basis. Near term actions will focus on confirming or refining, if appropriate, clean up techniques, removing renlaining debris/dust from the WTC collapse and offering clean up and post clean up sampling to residents.

Program Implementation:

EPA will be the lead agency for overseeing all actions of the program. NYCDEP is collaborating and supporting the program by taking responsibility for issuing and managing contracts for key components of the program and for directly implementing three of the projects: cleaning of unoccupied buildings, cleaning of exteriors of buildings and obtaining HVAC expertise. EPA will directly implement the pilot building cleaning effort and the background study.

Program Components:

A) Near-term; The goal of the near term program is to provide cleaning and sampling to residents of Lower Manhattan upon request, to provide additional indoor air sampling data for asbestos to evaluate qualitatively the effectiveness of clean up techniques, to provide confirmation of information on recommended clean up techniques, and to assure removal of any remaining debris/dust outside of WTC ground zero area which may still remain, thereby eliminating potential for re-entrainment in the air.

Timing ofNear Term Efforts: Activities are underway now to prepare for the EPA hotline becoming operational on May 30. Outreach efforts will begin shortly to advertise the availability of the cleaning and testing program. Duration of all efforts may continue through December depending upon public response.

1 ■ Cleaning of Debris-Laden Unoccupied. Uncleaned Buildings

Program: The remaining unoccupied (residential and commercial), uncleaned buildings near the WTC site that contain WTC-debris will be cleaned. NYC will work with building owners to determine reasons that these buildings have not been cleaned yet. If building owners are not able to expeditiously clean their property, NYC will proceed. It is estimated that there are 5-10 of

1

CITY_21MC100_003049700

NYC-WTC_000317690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000317690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000141516 · Box DEP Box 05

Request detailing EPA contract administration for resident cleaning, air sampling, and debris removal efforts in Lower Manhattan.

Similar indexed content

Compare copies and versions →