NYC-WTC_000282175
Testwell Laboratories submission for lease-related testing, City records.
8 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗Facility inspected for signs of fungal growth; preliminary findings and activities listed.
NYC-WTC_000306456–000306458OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Mr. Michael Deane
’flu TESTWELL’ laboratories,INC. Regarding: Bovis Lend Lease LMB, Inc. Fungal Inspection and Prevention 55 Church Street New York, New York June 6, 2002 Page 2
majority of the curtainwall was damaged or destroyed and to the kitchen area where there are likely sources of moisture. No standing water was observed on floors 3, 4 or 5.
The lower levels {C and SC) were inspected and signs of fungal growth were observed in the housekeeping office area(s) located on the Cellar level, along the west foundation wall. Fungal growth was observed concentrated on the furred out drywall partition in several of the areas. Other surfaces within the housekeeping office proper were also observed to have visible fungal growth, including a leather chair and carpeting.
Standing water has been observed in the past in several lower level areas including the laundry area and electrical equipment room.
Collection of Samples for Presence of Fungal Contamination Samples to determine the presence of viable fungal contamination were collected from the following materials:
Piping system insulation jacket (ASJ) that indicated visible fungal growth located within a mechanical pipe chase on the 50’" floor.
Drywall from mechanical chase indicating fungal growth on 50’^ floor.
Material from leather chair located in housekeeping office on cellar level.
Acoustic duct lining from HVAC #3 located in the e’" floor MER and feeding the 3'" floor.
These samples have been submitted to the laboratory for incubation and analysis. We anticipate having results on the testing on or about June 12"’.
Recommended Actions to Prevent Fungal Growth As fungal growth has been observed in several areas of the building, it is important to reduce or eliminate the host conditions for further growth. To that end, we recommend that HVAC systems be made operational to circulate air and provide conditioning to eliminate moisture in the air. As the building is currently undergoing decontamination of asbestos fibers, this activity should be limited to those areas where such decontamination has already been performed.
Prior to re-starting, the HVAC systems should be re-commissioned in accordance with the procedures established by Cosentini Associates, including cleaning of the HVAC units and related ductwork and installing new filters.
Mechanical chases on the 50"’, 45’" and every five floors downward thereafter, should be opened and all vertical penetrations seal^ with an appropriate material. Un-insulated piping within the mechanical chases should be insulated to prevent condensation. Drain pans in the fan coil units should be checked to
CITY_DEP_WORBY_CANNATA_SUBP_000007191
NYC-WTC_000306457
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000282175
Testwell Laboratories submission for lease-related testing, City records.
8 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000363343
Memo informing asbestos cleanup activities at the hotel and related certifications.
6 shared non-person entities · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000363347
Lab note detailing HVAC-related sampling coordination for the hotel project.
6 shared non-person entities · similarity 0.892
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.885
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232813
Correspondence between EPA, FEMA, and DEP validating analytical results for residential building cleanup at 114 Liberty Street.
1 shared non-person entities · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441026
Correspondence between EPA, FEMA, and DEP validating analytical results for residential building cleanup at 114 Liberty Street.
1 shared non-person entities · similarity 0.883
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105886
Letter from Testwell Laboratories dated June 6, 2002, regarding an inspection at 200 Park Avenue.
8 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105883
Form from Testwell Laboratories regarding a lease at 200 Park Avenue and site identification.
4 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163378
Memo letter forwarding a report document regarding environmental conditions or cleanup status at 125 Cedar Street.
1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139331
Mold regs discussion and cleaning scope inquiry.
1 shared topics · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139360
DEP official asks if new mold regulations require inclusion in the cleaning scope for 125 Cedar Street.
1 shared topics · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000103604
One-hundred-eighteen page document from Testwell Laboratories presenting final air sample results for a lease at 200 Park Avenue.
8 shared non-person entities · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000282175
Testwell Laboratories submission for lease-related testing, City records.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105886
Letter from Testwell Laboratories dated June 6, 2002, regarding an inspection at 200 Park Avenue.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123667
Form documenting building inspection findings including facade assessment and ACM presence for a property in the WTC area.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123667
Form documenting building inspection findings including facade assessment and ACM presence for a property in the WTC area.
Similarity score 0.968 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282175
Testwell Laboratories submission for lease-related testing, City records.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105886
Letter from Testwell Laboratories dated June 6, 2002, regarding an inspection at 200 Park Avenue.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000105886
Letter from Testwell Laboratories dated June 6, 2002, regarding an inspection at 200 Park Avenue.
Similar indexed content
NYC-WTC_000282175
Testwell Laboratories submission for lease-related testing, City records.
Similar indexed content
NYC-WTC_000105883
Form from Testwell Laboratories regarding a lease at 200 Park Avenue and site identification.
Similar indexed content
NYC-WTC_000363343
Memo informing asbestos cleanup activities at the hotel and related certifications.
Similar indexed content
NYC-WTC_000163378
Memo letter forwarding a report document regarding environmental conditions or cleanup status at 125 Cedar Street.
Similar indexed content