GRACE CONTRACTING CORP. 51-45 61h Road, WhilestonB, N.Y. 11357-(713) 767-9000 DATE: DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions VERY MILD AND FOGGY
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOL VAN ROLL OFF DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE______ LOW BED TRAILER MORTH OF VISTA & PASSING TO TO 750 - 750 LOADING HIGH DECK TRAILERS FULLY EUKES & FLATS IN BOTTOM OF PIT________ WELDING TRUCK 973 ALSO LOADING IN BOTTOM_____________________ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW PUMP 2 78 OUT OF AMEC (53 GRACE. 25 DOS/DOT) ROLLER RAINMAKER/GENIE LIFT 1 550 BUCKET 1 Description of Work; WORK PERFORMED LOAD OUT STEEL AND DEBRIS________________________________ MANNED TARPING AND TRIMMING STATIONS___________________ MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2
SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253
GRACE CONTRACTING CORP I Approved By: •itie: BY: I For: SUPERIfiTENDENT *
DAILY WORK FORCE REPORT 1213N.xls
CITY_21MC100_003123770
NYC-WTC_000305392
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278986
Day shift daily workforce report for World Trade Center site, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302401
Day final daily workforce and equipment at World Trade Center site, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291290
Night final daily workforce report for World Trade site with weather notes (Dec 13, 2001).
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267225
Night preliminary daily workforce and equipment for World Trade Center site, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280776
Daily workforce and equipment at World Trade Center, Dec 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291374
December 8, 2001 night daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267227
Night preliminary daily workforce and equipment for World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278986
Day shift daily workforce report for World Trade Center site, December 12, 2001.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
Similar indexed content
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content
NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
Similar indexed content
NYC-WTC_000408090
Analytical- project report discussing subcontractor licensure and wage concerns; Safeway waste subcontracts.
Similar indexed content
NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
Similar indexed content