Daily work force report, World Trade Center, Dec 6, 2001

Machine-extracted title · confidence 42%

Night final daily workforce report for World Trade Center site, Dec 6, 2001.

NYC-WTC_000305377
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 1S1-»5 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE; DECEMBER 6. 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Nams & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT, Description MANNED iSTANDBYl IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 1. • 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER7GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1 Ji _DescriptionofWorK_____________________________________________________________________________________ LOADS OUT: 26 DUMP TRAILERS/HIGH BEDS', 33 EUCLIDS_______________________________________________ __ LOAD OUT STEEL AND DEBRIS___________________________________________________________________ MAN TARPING AND TRIMMING STATIONS ________________________________________ MAN WATER STATIONS FOR DUST CONTROL__________ _ ______________________________________________ __ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE NORTH WALL COLUMNS ___________________________________________ _ ELEVATIONS: ALL MACHINES LEVEL B-5 253 ______ __________________________________________________ — DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY:________________________ __ FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED.____________________________ _ __________ GRACE CONTRACTING CORP Approved By; Title; BY: / Tor: iSUPERiNTEND^

DAILY WORK FORCE REPORT 1206N.xls

CITY_21MC100_003125809

NYC-WTC_000305377

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305377Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →