NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment k CLASSIFICATION UANTIT Description .MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 18 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 AWISCO OXY/ACET WELDING TRUCK 1 AWISCO TIPS FUEL TRUCK 1 AWISCO OXY/ACET PICKUP TRUCKS 7 LIGHT TOWERS 9 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: GATEWAY 550 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D______________ 365 1-2PM FIRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25__________________________ CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC. MANNED TARPING AND TRIMMING STATIONS___________________________________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ___________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2 CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/AMEC ELEVATIONS; 1200-264, 550-274, 375-284, 365-274 ___ LOADS OUT 49 ( c^ri <aS Approved By: Title: For; SUPERINTENDENT
CITY_21MC100_001231366 NYC-WTC_000305242
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388212
Daily workforce and equipment listing for World Trade Center site, November 15, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302417
Final daily workforce report for World Trade Center work, listing crew and machinery.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278576
Daily workforce and equipment listings for World Trade Center site, Nov 15, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291281
Day final daily workforce report for World Trade Center project, Nov 30, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291284
Daily workforce record for World Trade site with equipment and personnel counts (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280077
Night shift daily workforce and equipment for World Trade Center, Nov 29, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279726
Night shift daily workforce/equipment summary for World Trade Center project, Nov 29, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305363
Night final daily workforce and equipment listing for World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280076
Daily workforce and equipment listings for World Trade Center, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388178
Final daily workforce report for World Trade site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388212
Daily workforce and equipment listing for World Trade Center site, November 15, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302417
Final daily workforce report for World Trade Center work, listing crew and machinery.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278576
Daily workforce and equipment listings for World Trade Center site, Nov 15, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291281
Day final daily workforce report for World Trade Center project, Nov 30, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similar indexed content
NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similar indexed content
NYC-WTC_000388212
Daily workforce and equipment listing for World Trade Center site, November 15, 2001.
Similar indexed content
NYC-WTC_000302417
Final daily workforce report for World Trade Center work, listing crew and machinery.
Similar indexed content
NYC-WTC_000278576
Daily workforce and equipment listings for World Trade Center site, Nov 15, 2001.
Similar indexed content