Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 32%

Night shift daily workforce report detailing personnel, classification, and equipment at World Trade Center job.

NYC-WTC_000305238
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357.(718)767-9000 DATE: SUNDAY 12/2/01 NIGHT PRELIMINARY

DAILY WORK FORCE REPORT

__________________ _j______________________ Job Name & Location: World Trade Center Contract No. Weather Conditions T Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLB SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOLVAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:_____________________________________________________ PRELIMINARY/ANTICIPATED WORK________________________________________________ 235 HAMMER IS REMOVING CONCRETE WALL AROUND THE VISTA ELEVATOR SHAFTR______ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH MANNED TARPING AND TRIMMING STATIONS_______________________________________ MANNED WATER STATIONS FOR DUST CONTROL____________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 PREP FOR THE BURNING OF THE NORTHWEST CORNER COLUMN BEAMS

GRACE CONTRACTING CORP Approved By: Title: For: SUPERINTENDENT

CITY_21MC100_001231345 NYC-WTC_000305238

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305238Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →