NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: December 3, 2001 MONDAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 9 HITACHI 550 BUCKET 1 LOCAL 15 14 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 2 HOUSE WRECKERS 5 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS 2 6 FREON DETECTORS WELDING TRUCK ■ FUEL TRUCK 1 6 LOADS DOT MILLINGS ■ PICKUP TRUCKS 5 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ■ 10 WHEEL DUMP TRUCK " FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ■ CARGO BOXES 3 NOTE: 13 LIGHT TOWERS USED 2.5 HOURS ■ FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1
Description of Work: LOADS OUT: LOADS OUT: 55 TRAILERS_______________________________________________________________________________ LOADS OUT: 110YUKES____________________________________________________________________ ____________ LOAD OUT STEEL AND DEBRIS___________________________________________________________ MANNED TARPING AND TRIMMING STATIONS_____________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_______________________________________________ ____________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY PREP FOR THE BURNING OF THE SW CORNER COLUMN BEAMS
GRACE CONTRACTING CORP I Approved By: Title: For: ~BY: 4A SUPERINTENDENT
DAILY WORK FORCE REPORT1203D.xls
CITY_2IMCl0 0_0 012 312 81 NYC-WTC_000305229
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305231
Day final daily workforce and equipment at World Trade site, Dec 3, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305041
Final daily workforce and equipment at World Trade site, Dec 3, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305211
December 8, 2001 daily workforce report for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388368
Night shift daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305223
Night preliminary daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432489
Final daily workforce report for World Trade Center construction, Dec 3, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389471
Daily workforce and equipment at World Trade site, Dec 3, 2001 (MONDAY FINAL).
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305231
Day final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305041
Final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305211
December 8, 2001 daily workforce report for World Trade Center.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000305231
Day final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content
NYC-WTC_000305041
Final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content
NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
Similar indexed content