GRACE dONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718)767-9000 DATE: DECEMBER 4. 2001 (DAY FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: OZONE PARK LUMBER HIGH DECK TRAILERS 3 AWISCO BATTERIES WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work:___________________________________________________________________________ _________ __ LOADS OUT: 67__________________________________________________________________________________________ LOAD OUT STEEL AND DEBRIS___________________________________________________________________________ MANNED TARPING AND TRIf^MING STATIONS______________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________________________________________________ _ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253______________ YUKE LOADS 76 GRACE CQNTRACIPNG COI Approved By: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1204D.xls
CITY_21MC100_001231243 NYC-WTC_000305226
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388457
Daily workforce report for World Trade Center project, December 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305372
Day final daily workforce report for World Trade Center site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388374
Night shift daily force report for World Trade Center project, Dec 7, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278689
Day shift workforce and equipment listing for World Trade Center, December 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280089
Final daily work force report listing personnel and equipment for World Trade Center project site, Dec 6, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388368
Night shift daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388457
Daily workforce report for World Trade Center project, December 4, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388457
Daily workforce report for World Trade Center project, December 4, 2001.
Similar indexed content
NYC-WTC_000305210
Night daily workforce for World Trade Center, December 7, 2001.
Similar indexed content
NYC-WTC_000388367
Day shift daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000266919
Day final daily workforce status for World Trade Center project.
Similar indexed content