NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade site, Dec 6 2001

Machine-extracted title · confidence 38%

Night preliminary daily workforce and equipment summary for World Trade project, Dec 6, 2001.

NYC-WTC_000305216
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 6, 2001 (NIGHT PRELIMINARY)

DAILY WORK FORCE REPORT

Job Name '& Location: World Trade Center Contract No. Weather Cpnditions

Labor Equipment CLASSIFICATION QUANT. Description IvlANNED STANDBY IDLE SUPERINT ENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE Eh GINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 20 HITACHI 750 GRAPPLER 1 IRON WOf^KERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 I 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER__________ ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN ■ 235 HAMMER HOE RAM 1 TEAMSTEI^S 10 ■ MECHANICS TRUCK 1 1 MECHANICS__________ 1 ■ TOOLTRUCK 1 HOUSE WljtECKERS 6 ■ TOOLVAN ■ ROLL OFF 1 ■ DUMP TRAILERS 6 ■ LOW BED TRAILER i HIGH DECK TRAILERS 2 I WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 ' CARGO BOXES 3 ■ FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description |of Work; PRELIMINARY WORK / ANTICIPATED______________________________________________________________________ E2A2^9yxsTEELAND2EBRis2^^^2ZZZZZZZZZZZZZZZZZZZZZZZZZZZZ=ZZZZ=ZZZZZZZ MAN TARPING AND TRIMMING STATIONS__________________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL ~ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ~ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS_________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1206N.xls

CITY_2IMCl00_001231144 NYC-WTC_000305216

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305216Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →