machine-extracted · confidence unavailable · Check page ↗Sunday 12/9/01 night final daily workforce at World Trade Center.
NYC-WTC_000305206OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 15,-45 6(h Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; SUNDAY 12/9/01 NIGHT FINAL ■I daily work force report
Job Name & Location: World Trade Cehter Contract No. Weather Conditions CLEAR & COOL
Labor I Equipment CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT 2 [CAT 966 LOADER 1 PROJECT ENGINEER i II CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 6 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER _____________________ I_______ HIGH DECK TRAILERS 2 365 & 750 DOWN BELOW LOADING EUKES & FLATS WELDING TRUCK _________________________ 1________ FUEL TRUCK 1 1200 & 375 ON SLOPE FEEDING DEBRIS TO PICKUP TRUCKS 3 OUR TRUCKS i LIGHT TOWERS 13 SITE MULE 3 CLEANED OUT CHILLER OUTFALL DUMP TRUCKS BURNED REMAINING COLUMNS IN NORTH WALL 10 WHEEL DUMP TRUCK 54 LOADS OUT (TOP)j FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 43 EUKES OUT (BELOW) CARGO BOXES 3 4 FLATS OUT (BELOW) FLAT TRUCK PUMP 2 ■ ROLLER ■ RAINMAKER/GENIE LIFT 1
Description of Work; WORK PERFORMED LOAD OUT STEEL AND DEBRIS I MAN TARPING AND TRIMMING STATIONS__________________________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUTjOF AREA____________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS_________________________________________________ ELEVATIONS; ALL MACHINES LEVEL B-5 253
GRACE CONTRACTING CORP Approved By: ~BY: ~ Title: i For: SUPERINTENDENT '
DAILY WORK FORCE REPORT1209N.xls
CITY_2 IMCl 0 Ci_0 01231027 NYC-WTC_000305206
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000322139
Night final daily workforce and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322216
Night final daily workforce report for World Trade Center site, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280099
Night final daily workforce report for World Trade Center, Dec 11, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419107
Night shift workforce and equipment listing for World Trade Center, Dec 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278679
Night shift daily workforce and equipment at World Trade Center, December 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305216
Night preliminary daily workforce and equipment summary for World Trade project, Dec 6, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237597
A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305603
Day final daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280094
Night final daily workforce report for World Trade Center, Dec 8, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291322
Night preliminary daily workforce report for World Trade Center; crew and equipment listed.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000322139
Night final daily workforce and equipment listing for World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322216
Night final daily workforce report for World Trade Center site, Dec 9, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280099
Night final daily workforce report for World Trade Center, Dec 11, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419107
Night shift workforce and equipment listing for World Trade Center, Dec 9, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000322139
Night final daily workforce and equipment listing for World Trade Center site.
Similar indexed content
NYC-WTC_000322216
Night final daily workforce report for World Trade Center site, Dec 9, 2001.
Similar indexed content
NYC-WTC_000280099
Night final daily workforce report for World Trade Center, Dec 11, 2001.
Similar indexed content
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.