GRACE CONTRACTING CORP. ISMS 6th Road, Whitestone, N.Y. 113S7-(718) 767-9000 DATE: 1/29/02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN 2 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 1 1 LOCAL 15________________________________ 6 TOOLTRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER 4 MECHANICS 1 EUKES 3 HOUSE WRECKERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work: COMPLETED WORK______________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA____________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE DELAYS DUE TO NORMAL INSPECTION OF MATERIAL BY FDNY_________ LOADS OUT: 100_________________________________________________ YUKESOUT: 118 DOT OUT: 31
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0129N.xls
CITY_21MC1OO_OO4334175
NYC-WTC_000305184
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356570
Daily labor/equipment roster for World Trade site, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419072
Night preliminary daily workforce report for construction at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305509
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306053
Daily workforce report listing labor classifications and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237682
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429460
Night shift daily workforce and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419055
Night shift daily workforce report for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263634
Night shift daily workforce and equipment at World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429415
Day shift staffing and equipment details for World Trade Center project on 1/29/02.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356570
Daily labor/equipment roster for World Trade site, Jan 27, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419072
Night preliminary daily workforce report for construction at World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305509
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306053
Daily workforce report listing labor classifications and equipment at World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
Similar indexed content
NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content
NYC-WTC_000356570
Daily labor/equipment roster for World Trade site, Jan 27, 2002.
Similar indexed content
NYC-WTC_000419072
Night preliminary daily workforce report for construction at World Trade Center site.
Similar indexed content
NYC-WTC_000305509
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
Similar indexed content