GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11367-(718) 767-9000 DATE: 2/3/02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions:
Labor Equipment CLASSIFICATION QUANT. _______ Description______ MANNED STANDBY IDLE SUPERINTENDENT________________________ CAT 966 LOADER________ 1 PROJECT ENGINEER______________________ 1 CAT 365 6RAPPLER — OFFICE ENGINEER CAT 375 GRAPPLER 1 1 FOREMEN 2 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 HAMMER HOE RAM 2 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 6 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 DUMP TRAILERS TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 EUKES 4 MECHANICS 1 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 ‘COMPRESSOR RAN DURING SHIFT UNMANNED* DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER, 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2
Description of Work:_____________________________________________________________________ COMPLETED WORK___________________________________________________________________ CONTINUED TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORDED TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 101 YUKES: 168 DOT LOADS: 93_____________________________________________________________________________ ___ DELAYS: RECOVERY IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS; 1200 LOST 1 HR 0200-0300
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0203N.xls
CITY_21MC100_004366121
NYC-WTC_000305121
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291340
Night final daily workforce and equipment for World Trade Center, Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429421
Day preliminary report of labor and equipment for World Trade Center on 2/1/02.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356580
Day shift workforce and equipment list for Grace Contracting at World Trade Center site, February 2002.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similar indexed content
NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content
NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
Similar indexed content
NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similar indexed content
NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content