NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, Grace Contracting, WTC

Machine-extracted title · confidence 58%

Daily labor/equipment summary for World Trade Center site.

NYC-WTC_000305121
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11367-(718) 767-9000 DATE: 2/3/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions:

Labor Equipment CLASSIFICATION QUANT. _______ Description______ MANNED STANDBY IDLE SUPERINTENDENT________________________ CAT 966 LOADER________ 1 PROJECT ENGINEER______________________ 1 CAT 365 6RAPPLER — OFFICE ENGINEER CAT 375 GRAPPLER 1 1 FOREMEN 2 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 HAMMER HOE RAM 2 LOCAL 14 4 MECHANICS TRUCK 1 1 LOCAL 15 6 TOOL TRUCK CARPENTER TOOL VAN CARPENTER FOREMAN ROLL OFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 DUMP TRAILERS TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 EUKES 4 MECHANICS 1 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 ‘COMPRESSOR RAN DURING SHIFT UNMANNED* DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER, 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

Description of Work:_____________________________________________________________________ COMPLETED WORK___________________________________________________________________ CONTINUED TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINED TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORDED TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 101 YUKES: 168 DOT LOADS: 93_____________________________________________________________________________ ___ DELAYS: RECOVERY IN TOWER 1 SLOWED PRODUCTION DURING FIRST 3 HOURS; 1200 LOST 1 HR 0200-0300

GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0203N.xls

CITY_21MC100_004366121

NYC-WTC_000305121

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305121Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →