Daily labor and equipment roster for World Trade Center site, November 25, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Day final daily workforce and equipment at World Trade site, Nov 25, 2001.
NYC-WTC_000305037OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: SUNDAY NOVEMBER 25, 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor ____________ Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 23 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 3 MECHANICS TRUCK 2 TEAMSTERS g TOOLTRUCK 2 MECHANICS 3 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 6 DOT DUMP- 4 LOW BED TRAILER DOS DUMP-2 HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 9 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85’ FOOT GENIE 1 ANGEL AERIEL(DUST SUPR) 1 GENERATOR 1 CAT 235 HOE RAM Description of Work;_________ _ _______________________________________________________________________ LOADS OUT: 102____________________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS______________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL___________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________ _ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND CREATING THE RAMP AT THE NORTH / WEST CORNER & WORKING EAST TO B5-B6 &SOUTH TO MEET ROADWAY FROM B5-B6.
GRACE CONTRACTING CORF Approved By; Title; BY: For; SUPERINTENDENT I
NYC-WTC_000305037 CITY_2IMCl0 0_0 01215315
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280070
Daily workforce and equipment listings for World Trade Center site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280075
Workforce and equipment details for World Trade Center, Nov 28, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389391
Daily workforce report for World Trade site, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305414
Final daily workforce and equipment at World Trade site, Nov 15, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388264
Day shift daily workforce for World Trade Center site, November 29, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388337
Daily workforce and equipment listing for World Trade Center site, Nov 15, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388713
Night shift daily workforce details for World Trade Center site, Nov 28, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280070
Daily workforce and equipment listings for World Trade Center site, Nov 25, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280075
Workforce and equipment details for World Trade Center, Nov 28, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389391
Daily workforce report for World Trade site, listing personnel and equipment.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305431
Daily labor and equipment roster for World Trade Center site, November 25, 2001.
Similar indexed content
NYC-WTC_000280070
Daily workforce and equipment listings for World Trade Center site, Nov 25, 2001.
Similar indexed content
NYC-WTC_000280075
Workforce and equipment details for World Trade Center, Nov 28, 2001.
Similar indexed content
NYC-WTC_000305564
Day final daily labor and equipment at World Trade site, Nov 11, 2001.
Similar indexed content
NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
Similar indexed content