Overview of Air Monitoring Plan as of 09/25/01
o -0
c
CT
1
e
o
o
o
Work Zone
Zone Asbestos
11 sites (A-S; excluding G, O, Q, R)
24 hr samples; PCM/TEM; with
PM Other
PCBs, dioxins, furans, metals; all ~2/week,
o'
■a
o
p.
o ~10-hr sample at about 9 locations (from among o
o 18 sites (See site lists and maps) contract lab. A. - S); the exact number and distribution of the o
(A-S, excluding G, O, Q, R; ERT o
locations may vary from time to time, but c
o 1-3) 3
nominally include upwind, downwind, and o
o
residential sites.
More sites may be added
VOCs and Freon; 5 samples twice per day, at 3
fixed locations (1 - 3), and 2 varying locations,
Operational
but ensuring at least 2 in plume and 1
background; (duration depending on expected
ERT
loading)
ERTTAGA
1 VOCs and Freon, as requested by NYFD
i ERTTAGA
Phosgene, inorganic acids (HCl, H2SO4, HNO3),
FID/PID, multi-gas (02, LEL.H2S, SO2, CO),
Real time monitoring as needed, daily
ERT
Silicates; 2 samples /week at 6 locations (A - S)
ERT
siting, laboratory, and logistics pending.
VOCs: a single set of 24-hour canister samples
Same protocol as Work Zone PMi 5 TEOM continuous (except
Near Zone
Canal Street)
4 fixed roof-top sites (1-4) NYSDEC operation
PM,o 24-hour daily filter sample
(see site list and map)
Filters delivered to contract lab (except PM2.5 at Canal St.), ~4-day
Schedule; expected to be daily by NYSDEC lab turnaround
i operational by 9/28
o ' EPA site setup
s NYSDEC/EPA NYSDEC site operation
EPA PM,a filter weighing
o '
1°
o
OCR can misread numbers and units. Confirm readings against the page image before using them.