NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Jan 2001

Machine-extracted title · confidence 28%

Night preliminary daily workforce report for World Trade Center site.

NYC-WTC_000302500
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; 1/2/01 NIGHT PRELIMINARY

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 3 CAT 375 BUCKET 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER T LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER [185 CFM COMPRESSOR ~ 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK ~ 1 1 MECHANICS 1 TOOL TRUCK ~ HOUSE WRECKERS 9 TOOL VAN ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:_____________________________________________________________________________ PRELIMINARY/ANTICIPATED WORK______________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL__________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________________ 2 MACHINES AT LEVEL B5. 2 MACHINES AT LEVEL B6; EL 242________________________________________ CONTINUE ON B6 IN MER ROOM AND REMOVE ALL PIPING IN B6

GRACE CONTRACTING CORP Approved By; Title: BY; For; SUPERINTENDENT

DAILY WORK FORCE REPORT0102N.xls

I CITY_21MC1OO_OO3122O56

NYC-WTC_000302500

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302500Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →