NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 28%

Night preliminary daily workforce record for World Trade Center site.

NYC-WTC_000302497
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: JANUARY 4, 2002 NIGHT (PRELIMINARY) =====S=====SI==S=SS=S=S=

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. ________ Description______ SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT973 LOADER________ 1 FOREMEN 2 CAT 365 GRAPPLER T SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER LOCAL 14 5 HITACHI 550 BUCKET 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR T CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 MECHANICS 2 TOOLTRUCK HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER IDELIVERIES; HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 1 LIGHT TOWERS 13 SITE MULE 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1

Description of Work:______________________________________________________________________________ ANTICIPATED WORK____________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL___________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________________ 2 MACHINES AT LEVELS B-5, 2 MACHINES AT LEVEL 8-6; EL 242______________________________________ CONTINUE ON B-6 IN MER ROOM & REMOVE ALL PIPING ON B-6______________________________________ LOADS OUT:________________________________________________________________________________ ___ YUKESOUT;

GRACE CONTRACTING CORP| Approved By: BY: Title:_______ For; SUPERINTENDENT

DAILY WORK FORCE REPORT 0104N.xls

CITY_21MC100_00426673'7

NYC-WTC_000302497

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302497Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →