GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: JANUARY 4, 2002 NIGHT (PRELIMINARY) =====S=====SI==S=SS=S=S=
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. ________ Description______ SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT973 LOADER________ 1 FOREMEN 2 CAT 365 GRAPPLER T SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER LOCAL 14 5 HITACHI 550 BUCKET 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR T CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 MECHANICS 2 TOOLTRUCK HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER IDELIVERIES; HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 1 LIGHT TOWERS 13 SITE MULE 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1
Description of Work:______________________________________________________________________________ ANTICIPATED WORK____________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL___________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_________________________________________________ 2 MACHINES AT LEVELS B-5, 2 MACHINES AT LEVEL 8-6; EL 242______________________________________ CONTINUE ON B-6 IN MER ROOM & REMOVE ALL PIPING ON B-6______________________________________ LOADS OUT:________________________________________________________________________________ ___ YUKESOUT;
GRACE CONTRACTING CORP| Approved By: BY: Title:_______ For; SUPERINTENDENT
DAILY WORK FORCE REPORT 0104N.xls
CITY_21MC100_00426673'7
NYC-WTC_000302497
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269189
Night final daily workforce and equipment at World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302450
Day final daily workforce and equipment at World Trade Center site, Dec 30, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269192
Day preliminary workforce with equipment allocations for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000235132
Night shift daily log of laborers and heavy equipment at the World Trade Center site on January 4, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305221
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237645
Night shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 10, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302404
Day final daily workforce and equipment for World Trade Center site, January 9, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280004
World Trade Center workforce and equipment data for December 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269189
Night final daily workforce and equipment at World Trade Center.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302450
Day final daily workforce and equipment at World Trade Center site, Dec 30, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
Similar indexed content
NYC-WTC_000269185
Final daily workforce and equipment summary for World Trade Center project night shift.
Similar indexed content
NYC-WTC_000269189
Night final daily workforce and equipment at World Trade Center.
Similar indexed content
NYC-WTC_000305224
Day final daily workforce and equipment at World Trade site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000302450
Day final daily workforce and equipment at World Trade Center site, Dec 30, 2001.
Similar indexed content