NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Nov 19, 2001

Machine-extracted title · confidence 39%

Final daily workforce and equipment at World Trade Center site, Nov 19, 2001.

NYC-WTC_000302439
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ' Il I

1

GRACE CONTRACTING CORP. 151.45 6lh Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: NOVEMBER 19. 2001 (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions 1!

Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER i FOREMEN 1 [CAT 365 GRAPPLER* 1 SAFETY OFFICER 1 CAT 375 GRAPPLER* 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 1, CARPENTER 2 235 HOE RAM 1 II CARPENTER FOREMAN MECHANICS TRUCK 2 TEAMSTERS MECHANICS HOUSE WRECKERS 2 5 9 TOOL TRUCK TOOL VAN ROLL OFF 2 1 I DUMP TRAILERS 5 LOW BED TRAILER HIGH DECK TRAILERS 3 I WELDING TRUCK 1 FUEL TRUCK 1 I PICKUP TRUCKS ■e LIGHT TOWERS 8 PARTS TRUCK 1 r DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 2 FLAT TRUCK PUMP 2 185 CFM COMPRESSOR 1 CARGO TRAILER ■3

Description of Work; LOADS OUT: 61_______________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS III

MAN WATER STATIONS FOR DUST CONTROL____________________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________________________________________ CONTINUE REMOVING DEBRIS FROM EAST WALL OF TOWER 2 TO ACCOMMODATE SWING FOR TIE BACKS______________________________________________________________________________________ DELAYS: 1200 AND 550 WAITED ON FURTHER DIRECTION. AT 4:00 TO EXCAVATE INSIDE TOy^ER WALL. i 0 •CAT 365 AND 375 SERVICED EACH FOR 3.5 HOURS (7 HOURS TOTAU _______ iv——t— ;-ACyQ ONTRACgl^G CO):f| GRACl l! Approved By: Title: ii For: SUPeRINTENDENT

11

CITY_21MC100_010244046

NYC-WTC_000302439

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302439Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279998

World Trade Center labor and machinery counts for Grace Contracting, November 19, 2001.

Similar indexed content

Compare copies and versions →