NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 13, 2001

Machine-extracted title · confidence 41%

Night final daily workforce and equipment at World Trade Center site, December 13, 2001.

NYC-WTC_000302400
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RAGE CONTRACTING CORP. -tSSlhRoad, Whitestone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions VERY MILD AND FOGGY

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOLVAN ROLL OFF DUMP TRAILERS ^0 AND 375 PULLING MATERIAL FROM SLOPE LOW BED TRAILER ^yriToF VISTA & passing to to 750 - 750 loading HIGH DECK TRAILERS ’ WlLY EUKES & FLATS IN BOTTOM OF PIT WELDING TRUCK 973 ALSO LOADING IN BOTTOM FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW PUMP 2 78 OUT OF AMEC (53 GRACE, 25 DOS/DOT) ROLLER RAINMAKER/GENIE LIFT 1 550 BUCKET 1 . Description of Work: WORK PERFORMED_________ LOAD OUT STEEL AND DEBRIS________________________________ MANNED TARPING AND TRIMMING STATIONS___________________ MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ______________ CONTINUE REMOVING DEBRISFROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP

BY: SUPERINTENDENT *

DAILY WORK FORCE REPORT 1213N.xls

CITY_21MC100_004255809

NYC-WTC_000302400

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302400Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →