NYC 9/11 Public Portal Document
PR< ECT WORKSHEET REPORT
DECLARATION NO. FEMA-NY - DR1391 PREPARED DATE 06/04/2002
FIPS NO. 061-51000-33 REPORT DATE 08/09/2002 04:29
APPLICANT NAME NEW YORK / HOUSING AND PRESERVATION DEVELOPMENT
INF TYPE Q INF
SUBDIVISION HOUSING AND PRESERVATION DEVELOPMENT • NON-INF
FEMA PW # 964 VSN 0 REF# HPD020 O REC
SITES/LOCATIONS
ITE NUMBER 1
FACILITY NAME AIR MONITORING & TESTING Latitude
ADDRESS 100 GOLD STREET Longitude
CITY NEW YORK CITY STATE NY ZIP 10038
SITE NUMBER 1 - LOCATION
100 GOLD STREET NY, NY 10038
SITE NUMBER 1 - DAMAGE DIMENSIONS AND DESCRIPTION
THE COLLAPSE OF THE WORLD TRADE CENTER (WTC) ON September 11,2001 CAUSED A MASSIVE CLOUD OF
PULVERIZED CONCRETE AND DUST TO IMPACT BUILDINGS ADJACENT TO AND BLOCKS AWAY FROM THE WTC
COMPLEX. THE AFFECTED BUILDING OF NEW York CITY HOUSING PRESERVATION AND DEVELOPMENT (HPD) IS
LOCATED AT 100 GOLD STREET, APPROXIMATELY SIX (6) BLOCKS AWAY.
THE DUST CLOUD FROM THE COLLAPSE OF THE WTC COVERED THE BUILDING AT 100 GOLD STREET WITH A
LAYER OF PULVERIZED DEBRIS. THE DEBRIS AND THE APPARENT SHOCK WAVE FROM THE COLLAPSE
DAMAGED THE AIR INTAKE FAN ON TOP OF THE BUILDING ALLOWING THE DUST TO ENTER THE FAN CHAMBER
AND INSULATION. IN ADDITION, DUST AND DEBRIS CLOGGED EXTERNAL FILTERS AND LOUVERS, THEREBY
CREATING SIGNIFICANT VENTILATION PROBLEMS. THE VENTILATION SYSTEM THEN CARRIED THE DUST AND
PULVERIZED DEBRIS THROUGHOUT THE BUILDING. ALSO, THE LOBBY OF THE BUILDING WAS UTILIZED AS A
RELIEF CENTER FOR DISPLACED CITIZENS AND RESCUE PERSONNEL WORKING AT THE WTC DISASTER SITE.
THE PEOPLE USING THE RELIEF CENTER BROUGHT ADDITIONAL DUST AND DEBRIS INTO THE BUILDING. THE
DUST AND DEBRIS THAT IMPACTED THE BUILDING WAS POSSIBLY CONTAMINATED WITH ASBESTOS AND
OTHER HAZARDOUS MATERIALS AND THEREFORE, REQUIRED ENVIRONMENTAL
TESTING.
SITE NUMBER 1 - SCOPE OF WORK
WORK COMPLETE CONSISTS OF THE CONTRACTUAL WORK PERFORMED BY CONSULTING & TESTING
SERVICES. INC. (CTSI) FOR ADDITIONAL INDOOR AIR QUALITY TESTING AFTER COMPLAINTS BY HPD
EMPLOYEES OF A POSSIBLE HAZARDOUS WORK PLACE FOLLOWING THE INITIAL BUILDING AND VENTILATION
CLEANUP/REPAIR AND INDOOR AIR QUALITY TESTING FOLLOWING THE EVENTS OF September 11,2001. THE
COSTS INCURRED BY CTSI FOR WORK COVERED BY THIS PROJECT WORK SHEET TOTAL $8,750. CTSI TESTED
FOR THE FOLLOWING PARAMETERS DURING THE SEVEN VISITS TO 100 GOLD STREET: CARBON MONOXIDE,
CARBON DIOXIDE, RELATIVE HUMIDITY, TEMPERATURE, TOTAL PARTICULATE AND VOLATILE ORGANIC
COMPOUNDS (VOC'S). THE TESTING CONSISTED OF TECHNICIANS USING HAND HELD TEST DEVICES TO
COLLECT AIR SAMPLES AND HAVING A LABORATORY ANALYZE THE SAMPLES. THE INDOOR AIR QUALITY
TESTING WAS PERFORMED BETWEEN 10/05/01 AND 11/08/01.
THE TOTAL ELIGIBLE COSTS INCURRED BY HPD FOR WORK INDOOR AIR QUALITY TESTING AND ANALYSIS
PERFORMED BY CTSI TOTALS $8,750.
CITY_21MC100_001695493
NYC-WTC_000302300