NYC 9/11 Public Portal Document
Personnel from the lower manhattan sampling group also responded to a fire involving
equipment associated with the Main Chiller Plant. Apparently one of the work crews
were using acetylene torches against previous orders to dismantle a heat exchanger unit
in the former Main Chiller Plant, and ignited one of the internal coils that is made of titanium.
NYFD had the fire under control by the end of the evening, by covering the unit with sand.
o DISPOSAL (TOUW)
Stillwell & Gladding Laboratory, 130 Cedar Street - On 1/15, OEM granted EPA
access to the building, in order to further assess this testing laboratory, located on the
floor. Power has been restored to the stairways, but not to the whole building, and work
is on-going to provide power to the freight elevators. On 1/17, EPA, RST and ERRS
entered the laboratory to inventory the chemicals present and to develop a strategy for
segregation and packaging of the materials for their removal from the building. The
laboratory is covered with dust and debris as a ■ rv;'! of the WTC collapse, and the
containers themselves appear extremely old and questionable in their quality. The
owners of the lab, who relocated to Highland Park, NJ following 9/11, have expressed
their desire to claim the chemical inventory. EPA has raised concerns regarding
chemicals, as well as the company’s viability, and recommended that EPA arrange for
disposal of the materials rather than transferring them to the company.
Bl Level Truckdock Hazardous Waste Storage Cage - As of 1/17, this area remains
inaccessible. However, the Port Authority has informed EPA that work on this area is
expected to commence during the week of 1/21, at which time EPA will be able to
remove the remaining drums and access the hazardous materials storage locker, once the
suiTounding debris is cleared.
B-6 Level Oil Storage Tanks - During the week of 1/14, work began on the removal of
the access road into the Site from West Street. There are three large oil storage tanks, as
well as several smaller day tanks, in the general underlying vicinity of that access road,
which EPA has been unable to access due to safety concerns associated with the heavy
equipment utilizing the roadway. Once the roadway has been removed, the tanks are
expected to be exposed shortly thereafter, and EPA will be able to access them and pump
out their contents. The Port Authority advises EPA that this could happen during the
week of 1/21.
General Activities - EPA continues to oversee the recovery of oil/water from Verizon
and ConEd manholes and trenches around the site of 7 WTC. On 1/15, the Baker tank on
Vesey Street was deconned, and removed from the Site on 1/16. NYSDEC has informed
ConEd in writing that EPA intends to discontinue operation of the remaining Baker tank
on Barclay Street by the end of the month, and that they must make arrangements to
assume responsibility for the existing Baker tank or make alternate arrangements by that
time.
Overall, the following materials have been collected to date from the WTC site:
Batteries; 69