WTC Daily Site Evaluation, 10/23/2001

Machine-extracted title · confidence 40%

Daily safety evaluation listing issues at WTC sites AMEC and AMEX for action.

NYC-WTC_000302137–000302138
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Health WTC Daily Site Evaluation* 10/23/01 At least 50 NYPD, FDNY, & Federal Agents congregating around body recovery. WTC2 Discussed with sector chief. NEW Discussed at 8:00am ES&H meeting and 9:00am Contractors meeting. Need to improve process for safety review/coordination of contractor demo, plans. All zones Contractors will provide demo plans to Bob Adams, DDC/Rob Jones, COMP Bechtel prior to doing any demolition work. Unauthorized personnel and private vehicles should not be allowed in Unauthorized personnel walking and private vehicles driving through work areas. All zones OPEN work areas. Food and water still being brought to pile. Various locations Discussed with peisons bringing the food and water. OPEN Gas cylinders not segregated. Various locations Discussed with contractor’s respective safety reps.___________________ OPEN Gators and other small vehicles still going excessive speeds; also should have flags, All organizations on site should be required to operate vehicles safe and tzi All zones OPEN lights, etc, to increase visibility.________________________________________ maintain speeds below 10 mph within work areas. ex a Bechtel/Liberty Mutual/OSHA/Prime Contractors working to correct IN

I Crane setup and operating deficiencies as noted on report of 10/9/01, Large number of NYPD spectators near pile without proper PPE. Traffic control is congested and speeding continues. NYPD Gators5 delivering coffee and snacks to NYPD Officers stationed around or All zones All zones AMEC entrance deficiencies. Request assistance from NYPD to comply with safety requirements. Discussed with all contractor reps. Need letter from NYPD WTC Site Commander directing this practice to PROC OPEN OPEN

eou’t H • •• OtH ? All areas OPEN near the pile. I1(1. cease. Discussed with Verizon. No action taken. Followed up with letter to Bob Wooden shack constructed at Barclay and Greenwich by Verizon which is in the WTC7 Adams, DDC for follow up action. Meeting was set up w/Verizon, Turner, COMP way of heavy equipment movement, all trucks, other vehicles and pedestrians. Bechtel & DDC to discuss action plan. American Red Cross volunteers walking near pile by Church and Liberty. No PPE. Church and Liberty Asked them to please leave area, and they did, COMP Personal (worker) exposure monitoring: 10 Silica, 6 Diesel, 18 Asbestos (PCM), 9 Will continue sampling. Various workers NEW Carbon Monoxide: all below PELS. ujfd eevyfi*\LUL

F-i*^**^

(HVviMe. opeH T>rRx.o(a.v>c. <9<rex tT

o H

S O o o I o o to Ui ♦Site assessments are conducted daily in the WTC disaster area. The primary focus is to identify and conect any major unsafe practices and unsafe conditions. co to o wo

NYC-WTC_000302138

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000302138Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

12 shared non-person entities · 1 shared topics · similarity 0.993

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

WTC Daily Site Evaluation, Oct 23, 2001 · page 2

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

Similarity score 0.998 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

Similar indexed content

NYC-WTC_000187868

Daily environmental safety evaluation report for the WTC site noting PPE issues, fall protection gaps, and structural cracks.

Similar indexed content

NYC-WTC_000360441

WTC site safety evaluation with PPE, fall protection, and crane concerns discussed.

Similar indexed content

NYC-WTC_000407564

Daily site safety evaluation noting PPE, elevated hazards, and structural concerns at WTC sites; safety recommendations.

Similar indexed content

NYC-WTC_000302572

Safety evaluation noting scaffolding and hazard corrections.

Similar indexed content

Compare copies and versions →