NYC-WTC_000305615
Day shift daily workforce and equipment details for WTC project on December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗December 3, 2001 day final daily work force report for World Trade Center site.
NYC-WTC_000291384OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTfUcTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 787-9000 DATE: December 3, 2001 MONDAY FINAL
daily work force report
Job Name & LocatIdn: World Trade Ceintor
Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBYl IDLE superintendent; 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER • 1 CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER . 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 9 HITACHI 550 BUCKET 1 LOCAL 15 14 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 2 HOUSE WRECKERS 5 TOOL VAN 1 ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 13 SITE MULE 3 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK ' 1 PUMP 2 ROLLER I 1 RAINMAKER/GENIE LIFT 1
Description of Work: LOADS OUT; LOADS OUT: 55 TRAILERS LOADS OUT: 110YUKES LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING iTD^INS MANNED WATER STATIONS FOR DLlSt CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM .QWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY PREP FOR THE BURNING OF THE SW CORNER COLUMN BEAMS ' ~ ----
GRACE CONTRACTING CORP ---------) Approved By: Title:_______ For: " SUPEi IDENT
DAILY WORK FORCE REPORT1203D.xls
CITY_21MC100_003180506
NYC-WTC_000291384
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305615
Day shift daily workforce and equipment details for WTC project on December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291311
Monday final daily workforce report for World Trade Center project with equipment.
1 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305576
Day shift daily workforce and equipment at World Trade site, Nov 23, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322118
Daily workforce and equipment details for World Trade Center site, including personnel roles and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280099
Night final daily workforce report for World Trade Center, Dec 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388380
Night final daily workforce at World Trade Center, Dec 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269187
Night preliminary daily workforce and equipment listing for World Trade Center.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305579
Night shift daily workforce and equipment at World Trade site, Nov 25, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388249
Night shift final daily workforce report for World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322139
Night final daily workforce and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280086
Night shift daily workforce/equipment for World Trade Center, Dec 4, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291306
Night final daily workforce report for World Trade Center project with equipment.
2 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305615
Day shift daily workforce and equipment details for WTC project on December 3, 2001.
Similar indexed content
NYC-WTC_000291311
Monday final daily workforce report for World Trade Center project with equipment.
Similar indexed content
NYC-WTC_000305576
Day shift daily workforce and equipment at World Trade site, Nov 23, 2001.
Similar indexed content
NYC-WTC_000322118
Daily workforce and equipment details for World Trade Center site, including personnel roles and machinery.
Similar indexed content
NYC-WTC_000280099
Night final daily workforce report for World Trade Center, Dec 11, 2001.
Similar indexed content