NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6lh Road, Whitestone, N.Y, 11357-(718) 767-')000 DATE: DECEMBER 5, 2001 (DAY ) FINAL DAILY WORK FORCE REPORT
Job Nama & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: AWISCO HIGH DECK TRAILERS 3 ABCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 LIGHT TOWERS USED FOR 2.5 HOURS FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: DELA YS: 2:30-4:00 PM ALL WORK STOPPED LOAD OUT STEEL AND DEBRIS •________________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS ,MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253__________________________________________________________ _ LOADS OUT 53 YU KE LOADS 35 GRACE CONTRACTING CORP Approved By: Title: BY; For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1205D.xls
CITY_21MC100_003180502
NYC-WTC_000291380
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000389525
Night preliminary daily workforce and equipment at World Trade Center, Jan 9, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432554
Night preliminary workforce and equipment for World Trade Center, Jan 9, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305220
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305157
Day shift daily workforce and equipment details for World Trade site, January 2002.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419287
Night preliminary daily workforce report with classifications and equipment for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419112
Day shift workforce and equipment tally for World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305199
Final daily workforce report for World Trade Center, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305376
Day final daily workforce report for World Trade Center site, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291307
Daytime daily workforce summary for World Trade Center project; includes equipment list.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388372
Night shift daily workforce and equipment at World Trade site, Dec 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280085
Day shift daily workforce and equipment at World Trade Center, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000389525
Night preliminary daily workforce and equipment at World Trade Center, Jan 9, 2002.
Similar indexed content
NYC-WTC_000432554
Night preliminary workforce and equipment for World Trade Center, Jan 9, 2002.
Similar indexed content
NYC-WTC_000305220
Day shift daily workforce and equipment at World Trade site, Dec 5, 2001.
Similar indexed content
NYC-WTC_000305157
Day shift daily workforce and equipment details for World Trade site, January 2002.
Similar indexed content
NYC-WTC_000388381
Day shift daily workforce at World Trade Center, Dec 12, 2001.
Similar indexed content