Final daily work force report, WTC site, Dec 2001

Machine-extracted title · confidence 32%

Night shift daily work force report for World Trade Center site, Dec 11, 2001.

NYC-WTC_000291369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 8th Road. Whileslona, N.Y. 11357-(718) 1'67-9000 DATE: DECEMBER 11, 2001 (NIGHT FINAL) 8PM DAILY WORK FORCE REPORT

Job Name & Location; World Trade Canter Contract No. Weather Conditions CLEAR & MILD

Labor Equipment CLASSIFICAlior? QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT ;__________________2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER i______________ CAT 973 LOADER 1 FOREMEN i 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS_________,______________ 17 HITACHI 750 GRAPPLER 1 IRON WORKERS , HITACHI 550 GRAPPLER 1 LOCAL 14____________________________ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER_______ ,______________ 185 CFM COMPRESSOR T CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS I 12 TOOL VAN ROLLOFF DUMP TRAILERS PROVIDED TRUCKING FOR ALL CONTRACTORS ON SITE LOW BED TRAILER TULLY HAD SOME FLATS AND EUKES HIGH DECK TRAILERS WELDING TRUCK 1200/750/375 DOWN BELOW LOADING OUT DEBRIS FUEL TRUCK 1 AND STEEL - LOADED OUR TRAILERS AND TULLYS PICKUP TRUCKS 3 TRAILERS AND EUKES LIGHT TOWERS 13 SITE MULE 3 550 ON TOP LOADING OUR TRUCKS DUMP TRUCKS WORKED IN PIPE CHAMBER NORTH OF NORTH 10 WHEEL DUMP TRUCK ROJECTION PLACED MATS AND MILLINGS___ FLASHING ARROW BOARD 1 USED 446 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 DELAYS:_________________________________ FLAT TRUCK 1 1200 DOWN FROM 11:45 TO 1:15 - RECOVERY PUMP 2 375 DOWN FROM 10:00 TO 10:30 - RECOVERY ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work: WORK COMPLETED________________________ LOAD OUT STEEL AND DEBRIS 35 GRACE AREA MAN TARPING AND TRIMMING STATIONS______ 34 EUKES MAN WATER STATIONS FOR DUST CONTROL 31 FLATS - DOWNSTAIRS MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA 105 AMEC AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS ELEVATIONS: ALL MACHINES LEVEL 13-5 253

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1211 N.xls

CITY_21MC100_003180490

NYC-WTC_000291369

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291369Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Daily work force report

NYC-WTC_000388184

Nov 20, 2001 night daily workforce report for World Trade site.

Similar indexed content

Compare copies and versions →