GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE; 2/15/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor il Equipment CLASSIFICATION QUANT. ~ll Description MANNED STANDBY IDLE SUPERINTENDENT 2 1 CAT 966 LOADER 1 FOREMEN 1 I CAT 365 GRAPPLER 1 PROJECT ENGINEER 2 j CAT 375 BUCKET 1 SAFETY OFFICER 1 •CAT 375 GRAPPLER 1 LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 1200 GRAPPLER 1 LOCAL 14 3 185 CFM COMPRESSOR •SEE NOTE LOCAL 15 5 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN 1 TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES; WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 ‘NOTE; 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 ~r~ SITE MULE 14 TEAMSTERS (10 DUMP TRAILERS, 1 HIGH BED, 3 EUKES ) I DUMP TRUCKS 2
10 WHEEL DUMP TRUCK _________________________________________ FLASHING ARROW BOARD 1 _________________________________________________ OFFICE TRAILER/GENER. 1 _________________________________________CARGO BOXES________ 4 _________________________________________ FLAT TRUCK_________ PUMP 2
Description of Work; COMPLETED WORK__________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA__________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT; 106
GRACE CONTRACTING CORP Approved By; BY: Title; For; SUPERINTENDENT
DAILY WORK FORCE REPORT0215D.xls
CITY_21MC100_004972779
NYC-WTC_000291356
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429471
Day shift workforce and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356572
Daily labor/equipment roster for World Trade site, Jan 28, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419064
Night shift final daily workforce report with classifications and equipment details.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429413
Labor and equipment staffing details for Grace Contracting at World Trade Center site on 1/28/02.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429465
Day shift daily workforce and equipment for World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361516
Day final daily workforce and equipment at World Trade site, Jan 28 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342311
Day final workforce and equipment listing for World Trade, Jan 24, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322149
Day final daily workforce and equipment at World Trade Center site, February 14, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266669
Daily labor and equipment roster for World Trade Center project, Feb 25, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252305
Night shift daily workforce and equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263646
Daily labor/equipment report for World Trade Center construction (1/29/02).
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429471
Day shift workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000356572
Daily labor/equipment roster for World Trade site, Jan 28, 2002.
Similar indexed content
NYC-WTC_000419064
Night shift final daily workforce report with classifications and equipment details.
Similar indexed content
NYC-WTC_000429413
Labor and equipment staffing details for Grace Contracting at World Trade Center site on 1/28/02.
Similar indexed content
NYC-WTC_000429465
Day shift daily workforce and equipment for World Trade Center project.
Similar indexed content