Daily work force report, World Trade Center, Dec 13, 2001

Machine-extracted title · confidence 45%

Day shift workforce and equipment at World Trade Center, Dec 13, 2001.

NYC-WTC_000291355
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road. VJhiteslone, N.Y. 11357.(718)767-9000 DATE: 2/14/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 PROJECT ENGINEER 2 CAT 375 BUCKET 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 1200 GRAPPLER 1 LOCAL 14 4 185 CFM COMPRESSOR ‘SEE NOTE LOCAL 15 5 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN 2 TOOL TRUCK TEAMSTERS (FUEL) 1 TOOLVAN MECHANICS 2 ROLL OFF HOUSE WRECKERS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES: WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 ‘NOTE: 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5 I SITE MULE 2 15 TEAMSTERS (11 DUMP TRAILERS, 1 HIGH BED, 3 EUKES ) DUMP TRUCKS__________ ZZZZZZZZZZZZZZZZZZZZZZiZZZZZZZZIZZZZZZ IO WHEEL DUMP TRUCK ________________________________________________________FLASHING ARROW BOARD 1 ________________________________________________________OFFICE TRAILER/GENER. 1 ________________________________________________________CARGO BOXES___________ 4 __________________________________________ _____________ FLAT TRUCK_____________ PUMP 2

=ss Description of Work:__________________________________________________ COMPLETED WORK________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE LOADS OUT: 121

GRACE CONTRACTING CORP Approved By: BY; Title; For: SUPERINTENDENT

DAILY WORK FORCE REPORT0214D.xls

CITY_21MC100_004972777

NYC-WTC_000291355

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291355Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →