NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 70 pages

DEP enforcement actions, Catskill region, Oct 2001

Machine-extracted title · confidence 49%

Report on enforcement actions in Catskill region, Oct 2001.

NYC-WTC_000291081–000291150
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2/11/00. 9/01: The discharge has been temporarily abated.

Name: NYS Route 30 I.D.#: 1326 Location: Middletown Type of Use: Residence Discovery Date; 12/30/98 Type of Violation: Failed septic system Status: Ongoing Overview and action; DEP personnel discovered the violation as a result of the Owner's request to inspect the site. A dye test was performed on 12/30/98, 9/01: The discharge has been temporarily abated.

Name; Hall Road I.D.#: 1464 Location: Middletown Type of Use: Residence Discovery Date: 4/15/99 Type of Violation: Failed septic system Status: Closed Overview and action; DEP personnel discovered the violation as a result of the Owner's request to inspect the site. A dye test was performed on 4/15/99. A soil/site evaluation was performed on 5/21/01. A design approval was issued on 6/19/01. The violation was resolved and the case was closed on 8/31/01.

Town: Neversink Drainage Basin: Neversink Reservoir Project Name: Papa’s B&B Service Center, (Log #11691) Project Description: SSTS Intermediate Repair Status: Ongoing Overview and Action: A pre-application conference was held on 5/16/01. The owner received an NOV on 5/14/01 and wishes to repair the failing system. The SSTS application was submitted by the engineer, prior to soils testing. A NICA was issued on 5/31/01. When soils tests are completed and a design is submitted the review will continue. Soils tests were completed on 6/8/01. A NOCA was issued on 8/1/01 for repair in accordance with the NOV. The design approval was issued on 8/1/01. DEP is currently waiting for a call to witness construction. SEQRA - TYPE II - Replacement in kind.

Town: Neversink Drainage Basin: Rondout Project Name; Neversink Fire District - SSTS, (Log #8705) Project Description; Replacement SSTS for fire house and 3 houses and expansion of fire house. Status; Closed Overview and Action: Applicant proposes a 280 seat addition to fire hall with restroom facilities (old community hall will be removed) therefore the flow will remain unchanged. Three residences are tied into the existing fire district system. NOV issued on 2/11/99. Application and engineered plans were submitted to DEP for review 6/28/99. NICA was

46

NYC-WTC_000291128

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291128Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →