NYC-WTC_000290442
Concrete test report for WTC project; LIRO NYC DDC; May–June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗WTC concrete field inspection notes; multiple sets; June 2002.
NYC-WTC_000290447OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
MUNICIPAL TESTING LABORATORY, INC. 102 NEW SOUTH ROAD, HICKSVILLE, NEW YORK 11801, 516-938-7120,516 938-5107 FAX sss CONCRETE REPORT LIRO Group/NYC DDC Attn; Mike Bailey Report Date: 6/17/2002 Address; Six Aerial Way Report Number: D1194 Lab#: 1557 Syosset, NY 11791 Date Cast; 5/20/2002 Project WTC Paving Project Contractor; Tully/Grace JV Concrete Plant; N/A Strength PSI; 4 •52 ss Yards Placed: 13.9 FIELD INSPECTION REPORT
Pour Location for Set # 1 on Exchange St. (North side) bet. William St. & Hanover St.
Pour Location for Set # 2:
Pour Location for Set # 3; Tests made in accordance with ASTM; Yes X Not Known Field Inspector(s); Client ASTM C 39 COMPRESSIVE STRENGTH TESTS AREA; 28.27 . Cylinder D a: 6" Cylinder Date Date Slump Air UnitWt. Temp F. Truck Tested Load strength I Required Type ID# Cast Tested Cl 43 C173, C231 Ct 38 Cl 064 No. Age KN PSI I Strength Frac Cylinder Set # 1 16A 5/20/2002 5/28/2002 4.0 8 921.5 7,330 4, •52 A 16B 5/20/2002 6/17/2002 4.0 28 1079.4 8,580 4, 55® A 16C 5/20/2002 6/17/2002 4.0 28 1022.6 8,130 4, 552 A
Cylinder Set # 2
Cylinder Set #3
Remarks;
Reviewed By: Laboratory Director f Richard Kasparian, P.E ^^^Mesis are conducted in accordance with ASTM C*39 or AASHTO T*22, By technicians certified by ACI. Municipal Testing is inspected by the Cement and Concrete Reference Laboratory of The National Institute of
^^Endards and Technology and (s Accredited by: AASHTO and is Licensed by: New York City (#19) and by The Stale of Florida. This report relates only to the item or exact location/item tested,
not to the entire construction. It can only be reproduced in fuH. and only with MunicipaJ Testing Laboratory. Inc. written permission. Our liability is strictly limited to the tee paid.
CITY_21MC100_001659453 NYC-WTC_000290447
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290442
Concrete test report for WTC project; LIRO NYC DDC; May–June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
3 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290444
Inspection notes for concrete on WTC project; curb and hydrant area; June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278486
Concrete test results and project identifiers for WTC paving.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342406
Field inspection report for concrete at WTC paving project (June 2002).
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278491
Concrete test results and field inspection notes for WTC project.
3 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186701
Field inspection report from Municipal Testing Laboratory regarding concrete strength testing for the HWM WTC A2/A3 project.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356586
Concrete field inspection report for LIRO Group/NYC DDC – WTC A2/A3, August 2002.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188038
Field inspection report documenting concrete compressive strength testing results.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000290442
Concrete test report for WTC project; LIRO NYC DDC; May–June 2002.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290444
Inspection notes for concrete on WTC project; curb and hydrant area; June 2002.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278491
Concrete test results and field inspection notes for WTC project.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290442
Concrete test report for WTC project; LIRO NYC DDC; May–June 2002.
Similar indexed content
NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
Similar indexed content
NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
Similar indexed content
NYC-WTC_000290444
Inspection notes for concrete on WTC project; curb and hydrant area; June 2002.
Similar indexed content
NYC-WTC_000278486
Concrete test results and project identifiers for WTC paving.
Similar indexed content