NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Grace Contracting daily workforce report, Oct 2

Machine-extracted title · confidence 54%

Daily workforce roster for World Trade Center site, Oct 2 shift details.

NYC-WTC_000290379
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i

GRACE CONTRACTING CORP. 151-45 eih Road. WhHestono,’N.Y. 11357-(718) 767-6000 DATE: 10-;

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANTIT Description MANNED IDLE SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT446 BACKHOE 1 OFFICE ENGINEER cat 973 LOADER 1 FOREMEN 1 ■ CAT245GRAPPLER SAFETY OFFICER 1 ■ CAT235GRAPPLER LABORERS 19 ’ CAT 375 GRAPPLER 1 IRON WORKERS 1 ■ CAT 365 GRAPPLER 1 LOCAL 14 _4_ ■ HITACHI 750___________ 1 LOCAL 15 6 ■ HITACHI 550 GRAPPLER 2 CARPENTER ■ HITACHI 1200 1 CARPENTER FOREMAN 1 ■ COMPACTION TRUCK I ■TEAMSTERS 16 ■ MECHANICS TRUCK 2 SCHANiCS 3 ■ TOOL TRUCK 2 "HOUSE WRECKERS 3i TOOLVAN 1 ■ ROLL OFF 1 DUMP TRAILERS 5 LOW BED TRAILER 1 HIGH DECK TRAILERS 7 WELDING TRUCK 2 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK LIQUID OXYGEN 0 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE (MED) 10 ACETELYNE (LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3 Description of Work:___________________________________________________________________ REMOVE STEEL AND DEBRIS EAST WALL NORTH EAST CORNER VISTA HOTEL AND WEST WALL TOWER 2 3 - DELAYS TOTALING 3.8 HOURS DUE TO FIRE DEPT. SEARCH & RESCUE ON TOP OF PILE WEST WALL TOWER 2._______________________________________________________________________________ _ MANNED TARPING STATION_____________________________________________________________ MANNED WATER STATION FOR DUST CONTROL_________________________________________ __________ MAINTAINED TRAFFIC FLOW IN AND OUT OF WORK AREA___________________________________ _________ 109 LOADS REMOVEDC 90 ON GRACE TRUCKING)

GRACE CONTRACTING CORP Approved By nao: BY: For SUPERINTENOeNT

CITY_21MC100_004889770

NYC-WTC_000290379

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290379Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000408021

Final daily workforce report for World Trade Center project.

Similar indexed content

Compare copies and versions →